Table 8: Summary of WQv Provided
  Step 5
  Step 3
  Reduced WQv to be
  Step 2  WQv Reduction by
  Treated by Standard
  WQv Required (CF)  Standard SMPs w/ RRv
  SMPs or Alternative
  Capacity (CF)1
  Practices (CF)2
  8,672  3,338  6,627
  Footnotes:
  1Step 3: WQv Reduction = RRv Provided + WQv Treated by Standard SMP with RRv Capacity
  2Step 5: Reduced WQv to be Treated = WQv Required – WQv Reduced

 Based upon the results listed in the above Table, the entire WQv has not been treated by application
 of RR techniques and standard SMPs with RRv capacity. As such, the standard SMPs or the Alternative
 Practices (without RRv capacity) described in the following sections, have been incorporated into the
 stormwater management plan for this project, to meet the WQv objective. Practice-specific calculations
 are presented in Appendix C.

 3.5.1  Underground Stormwater Detention System

 Underground stormwater detention systems store and detain stormwater runoff in order to meet water
 quantity control requirements. Stormwater is stored in subsurface vaults and/or a system of large
 diameter interconnected storage pipes. Stored water is then released at rates designed to reduce
 peak run-off flows during post-development storms. Underground stormwater storage provides
 minimal stormwater quality benefits, but can be an effective component of a development’s overall
 stormwater management plan.

 3.5.2  Hydrodynamic Separators

 Hydrodynamic separators accelerate the separation of floating and settling pollutants from stormwater
 through the use of a vortex. These pre-fabricated devices come in the form of an underground manhole
 or vault. The devices have no moving parts and are typically fabricated from concrete and marine grade
 aluminum.

 During operation, stormwater runoff enters the unit tangentially to promote a gentle swirling motion in
 a treatment chamber. As stormwater circles within the chamber, settable solids fall into a sump and
 are retained. Buoyant debris, oil, and grease rise to the surface and are separated from the water as
 it flows under a baffle wall. Finally, treated water exits the treatment chamber through a flow control
 orifice located behind the baffle wall.

 During low-flow conditions all runoff is diverted into the treatment chamber by a flow partition. At higher
 flow rates, a portion of the runoff spills over the flow partition and is diverted around the treatment
 chamber to prevent re-suspension and washout of previously trapped pollutants. Water that spills over
 the partition flows into a head equalization chamber above the treatment chamber outlet. As the head
 equalization chamber fills, the head differential driving flow through the treatment chamber collapses.
 The result is that flow rates in the treatment chamber remain relatively constant even as total flow
 rates increase substantially. This configuration further reduces the potential for re-suspension or
 washout.

Stormwater Pollution Prevention Plan
  Page 10