Part I.A.6.
  owner or operator must obtain documentation that project review, pursuant to
  a process equivalent to SEQR from another New York State or federal
  agency, has been satisfied.

7. If construction activities require Uniform Procedures Act (UPA) Permits (see 6
  NYCRR Part 621) from NYSDEC, or the equivalent from another New York
  State or federal agency, the owner or operator must:

  a. obtain all such necessary permits; or

  b. receive notification from NYSDEC pursuant to 6 NYCRR 621.3(a)(4)
  excepting Part I.A.7.a.

8. Construction activities are not eligible if they meet the following criteria in Part
  I.A.8.a. or b.:

  a. For linear transportation and linear utility project types, the construction
  activities:

  i. are within the watershed of surface waters of the State
  classified as AA or AA-S identified utilizing the Stormwater
  Interactive Map on NYSDEC’s website; and

  ii. are undertaken on land with no existing impervious cover; and

  iii. disturb two or more acres of steep slope.

  b. For all other project types, the construction activities:

  i. are within the watershed of surface waters of the State
  classified as AA or AA-S identified utilizing the Stormwater
  Interactive Map on NYSDEC’s website; and

  ii. are undertaken on land with no existing impervious cover; and

  iii. disturb one or more acres of steep slope.