Southtowns Record

PBA07.09.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jul 9, 2026, 6:00 p.m.
Posted by publisher
Jul 9, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 102 of 1493

Read the whole document on one page (all 1493 pages, each with its own heading)

3.6.2  Methodology

 In order to demonstrate that the NYSDEC detention requirements are being met, the Design Manual
 requires that a hydrologic and hydraulic analysis of the pre- and post-development conditions be
 performed using the Natural Resources Conservation Service Technical Release 20 (TR-20) and
 Technical Release 55 (TR-55) methodologies. HydroCAD, developed by HydroCAD Software Solutions
 LLC of Tamworth, New Hampshire, is a Computer-Aided-Design (CAD) program for analyzing the
 hydrologic and hydraulic characteristics of a given watershed and associated stormwater management
 facilities. HydroCAD uses the TR-20 algorithms and TR-55 methods to create and route runoff
 hydrographs.

 HydroCAD has the capability of computing hydrographs (which represent discharge rates characteristic
 of specified watershed conditions, precipitation, and geologic factors) combining hydrographs and
 routing flows though pipes, streams and ponds. HydroCAD can also calculate the center of mass
 detention time for various hydraulic features. Documentation for HydroCAD can be found on their
 website: http://www.hydrocad.net/.

 For this analysis, the watershed and drainage system was broken down into a network consisting of
 three types of components as described below:
  1. Subcatchment: A relatively homogeneous area of land, which produces a volume and rate of
  runoff unique to that area.
  2. Reach: Uniform streams, channels, or pipes that convey stormwater from one point to another.
  3. Pond: Natural or man-made impoundment, which temporarily stores stormwater runoff and
  empties in a manner determined by its geometry and the hydraulic structure located at its
  outlets.

 Subcatchments, reaches, and ponds are represented by hexagons, squares, and triangles,
 respectively, on the watershed routing diagrams provided with the computations included in Appendix
 D and Appendix E.

 The analysis of hydrologic and hydraulic conditions and proposed stormwater management facilities,
 servicing the study area, was performed by dividing the tributary watershed into relatively
 homogeneous subcatchments. The separation of the watershed into subcatchments was dictated by
 watershed conditions, methods of collection, conveyance, and points of discharge. Watershed
 characteristics for each subcatchment were then assessed from United States Geological Service
 (USGS) 7.5-minute topographic maps, aerial photographs, a topographical survey, soil surveys, site
 investigations, and land use maps.

 Proposed stormwater management practices were designed and evaluated in accordance with the
 Design Manual and local regulatory requirements. A local IDF file was imported, and specific mass
 curves were generated, in HydroCAD to evaluate the pre- and post-development stormwater runoff
 characteristics for various 24-hour storm events identified in the following Table.

Stormwater Pollution Prevention Plan
  Page 12
2241067
  Page 102 of 1493