5.1.5  Temporary Seeding
 For areas undergoing clearing, grading, and disturbance as part of construction activities, where work
 has temporarily ceased, temporary soil stabilization measures must be initiated by the end of the next
 business day and completed within fourteen (14) days from the date the soil disturbance activity has
 temporarily ceased.

 5.1.6  Manufactured Insert Inlet Protection

 Install insert inlet protection beneath the grate of all catch basins, to prevent sediment from entering
 the catch basins and storm sewer system. Remove sediment accumulation and repair or replace insert
 as necessary to ensure proper function.

 5.1.7  Filter Fabric Drop Inlet Protection
 Install filter fabric or silt fence with wooden stakes at the perimeter of existing or proposed catch basins
 located in lawn areas, to prevent sediment from entering the catch basins and storm sewer system.
 Remove sediment accumulation and repair or replace fabric as necessary to ensure proper function.

 5.1.8  Erosion Control Blanket
 Erosion control blankets shall be installed in accordance with manufacturer’s requirements on all
 slopes exceeding 3:1. Erosion control blankets provide temporary erosion protection, rapid vegetative
 establishment, and long-term erosion resistance to shear stresses generated by high runoff flow
 velocities associated with steep slopes.

 5.1.9  Stone Check Dams
 Stone check dams will be installed within drainage ditches to reduce the velocity of stormwater runoff,
 promote settling of sediment, and reduce sediment transport off-site.

 Sediment accumulated behind the stone check dam will be removed as needed to maintain flow
 through the stone check dam and prevent large flows from carrying sediment over or around the dam.
 Stones shall be replaced as needed to maintain the design cross section of the structures.

 5.1.10 Temporary Sediment Trap
 Temporary sediment traps shall be constructed to intercept sediment-laden runoff, reduce the amount
 of sediment leaving the disturbed areas, and protect drainage ways, properties, and rights-of-way.

 Accumulated sediment shall be removed from the trap when it reaches no greater than 50 percent of
 the design capacity. Sediment shall not be placed downstream from the embankment, adjacent to a
 stream, or floodplain.

 Temporary sediment traps depicted on the accompanying plans have been designed to provide 3,600
 CF of storage per acre of tributary watershed.

 5.1.11 Temporary Diversion Swales
 Temporary diversion swales shall be used to divert off-site runoff around the construction site and
 divert runoff from stabilized areas around disturbed areas.

 5.1.12 Dewatering Operations
 Dewatering will be used to intercept sediment-laden stormwater or pumped groundwater and allow it
 to settle out of the pumped discharge prior to being discharged from the site. Water from dewatering