Table 13: Implementation Schedule for Erosion and Sediment Control Measures
  Erosion and Sediment
  Initial Placement  Duration to Remain In-Place
  Control Measure
  Stabilized Construction Access  Upon mobilizing to site  Until construction is complete
  Dust Control  As needed  As needed
  Upon delivery of materials to the
  Until materials have been placed
  Temporary Soil Stockpile  site or excavation of on-site
  or removed from the site
  materials for reuse
  Prior to upgradient soil  Until upgradient area has achieved
  Silt Fencing
  disturbance  permanent stabilization
  Apply to any disturbed soil that will
  Apply additional seed as needed
  Temporary Seeding  remain exposed for more than 14
  for temporary stabilization
  days
  Existing structures: prior to
  Manufactured Insert Inlet  upgradient soil disturbance  Until upgradient area has achieved
  Protection  New structures: upon installation  permanent stabilization
  of structure/grate
  Upon completion of slope grading  Prior to final grading, or kept in
  Erosion Control Blanket
  operations  place permanently
  Existing swales: upon completion
  of swale reshaping
  Stone Check Dams  Permanent
  New swales: upon completion of
  swale excavation
  As needed during grading  Until final grading of tributary area
  Temporary Sediment Trap
  operations  is complete
  Until permanent drainage methods
  As needed to divert flow around  are established (i.e. closed storm
  Temporary Diversion Swales
  work area  sewer, open conveyance swales,
  etc.)
  Until excavation/backfilling is
  Dewatering Operations  As needed during excavation
  complete
  Prior to upgradient soil  Until upgradient area has achieved
  Fiber Roll
  disturbance  permanent stabilization
  Permanent, apply additional seed
  Establishment of Permanent  As soon as possible after
  as needed to achieve 80%
  Vegetation  completion of final grading
  minimum uniform coverage
  During installation of tributary
  Rock Outlet Protection  Permanent
  culverts/pipes

 5.4 Other Pollutant Controls

 Part I.C.1 of GP-0-25-001 prohibits discharges from construction material wastewater, pollutants
 used in vehicle and equipment operation and maintenance, vehicle and equipment washing and
 toxic or hazardous substances.

Stormwater Pollution Prevention Plan