where concrete trucks or equipment can be washed out after their loads have been discharged. Waste
 generated from concrete wash water that shall not be allowed to flow into drainage ways, inlets,
 receiving waters, highway right-of-way, or any location other than the designated concrete washout
 area(s). Proper signage shall be placed adjacent to the facility to designate the “Concrete Washout
 Area”. Locate the facility a minimum of 100-feet from drainage swales, storm drain inlets, wetlands,
 streams, and other surface waters. Prevent surface water from entering the washout area.

 The hardened residue from the concrete wash areas will be disposed of in the same manner as other
 non-hazardous construction waste materials. Maintenance of the washout area shall include removal
 of hardened material when 75% of the storage capacity is filled, and a minimum freeboard of 12
 inches shall be maintained. The Contractor will be responsible for seeing that these procedures are
 followed. The project may require the use of multiple concrete washout areas based on the frequency
 of concrete pours.

 5.5.7  Material Storage
 Construction materials shall be stored in a dedicated staging area. The staging area shall be located
 in an area that prevents negative impacts of construction materials on stormwater quality.

 Chemicals, paints, solvents, fertilizers, and other toxic material must be stored in waterproof
 containers. Except during application, the contents must be kept in trucks or within storage facilities.
 Runoff containing such material must be collected, removed from the site, treated, and disposed of at
 an approved solid waste or chemical disposal facility.

 6.0  INSPECTIONS, MAINTENANCE, AND REPORTING

 6.1 Inspection and Maintenance Requirements

 6.1.1  Pre-Construction Inspection and Certification

 Prior to the commencement of construction, the Qualified Inspector/Qualified Professional shall
 conduct an assessment of the site and certify that the appropriate erosion and sediment control
 measures have been adequately installed and implemented. The Contractor shall contact the Qualified
 Inspector/Qualified Professional once the erosion and sediment control measures have been
 installed.

 6.1.2  Construction Phase Inspections and Maintenance

 A Qualified Inspector/Qualified Professional, as defined in Appendix A of the General Permit GP-0-25-
 001, shall conduct regular site inspections between the time this SWPPP is implemented and final site
 stabilization. Site inspections shall occur at an interval of at least once every seven (7) calendar days.

 The purpose of site inspections is to assess performance of pollutant controls. Based on these
 inspections, the Qualified Inspector/Qualified Professional will decide whether it is necessary to modify
 this SWPPP, add or relocate sediment barriers, or whatever else may be needed in order to prevent
 pollutants from leaving the site via stormwater runoff. The general contractor has the duty to cause
 pollutant control measures to be repaired, modified, maintained, supplemented, or whatever else is
 necessary in order to achieve effective pollutant control.

 Examples of particular items to evaluate during site inspections are listed below. This list is not
 intended to be comprehensive. During each inspection the inspector must evaluate overall pollutant

Stormwater Pollution Prevention Plan
  Page 22
2241067
  Page 112 of 1493