Southtowns Record

PBA07.09.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jul 9, 2026, 6:00 p.m.
Posted by publisher
Jul 9, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 1139 of 1493

Read the whole document on one page (all 1493 pages, each with its own heading)

EX. PIN  CB

  UE
  RIM:683.34

  G
  APPROX. LOCATION
  TOPSOIL STOCKPILE

  W
  682  N. INV:672.94 (18")

  ST
  W/ SILT FENCE  S. INV:673.10 (18")

  SA
  CB

  OE
  "  RIM:680.53
  32

  UE
  8'-  N. INV:671.23 (18")

  EX 5' N .ST
  CB
  °-5  683

  G

  5.2 32' E OE
  0  S. INV:671.23 (18")

  .N .
  SILT FENCE/SILT SOCK  5  10  RIM:685.39

  0W.
  67  680
 sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor

  AI
 to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.

  (LIMIT OF DISTURBANCE)  N. INV:677.49 (18")

  L
 All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145

  87°-09'-45"  S. INV:677.49 (16")

  Greensboro
  684  E. INV:676.99 (4")

  UE

  SA G
  UE

  OR
  T  MH
  LO

  W
  CONCRETE  IT.  RIM:685.89
  B  685  NW. INV:676.14 (12")

  UE

  C
  WASHOUT PIT
  SE. INV:676.22 (12")

  UE
  680

  HA
  1.0
  686

  PP .

  G OE
  SW
  SA
  'E

  T
  UE
  12"
  EX. REBAR

  R
  4.11' N.

  Utica
  687

  D
  N

  UE
  O
  AY

  TI
  EX. TREE TO BE  EW
  STABILIZED

  X. UE
  CA

  680

  CO
  IV

  G E

  PA
  CONSTRUCTION

  675
  REMOVED (TYP.)  DR

  LO

  O
  683

  W
  NC
  113°-18'-53"  T.
  BI  ENTRANCE ONE

  59

  .P
  O
  7"  ST

  .8'

  SA S
  PR

  AD

  RK
  UE
  UE
  12"

  Buffalo
  CONSTRUCTION TRAILER

  AP
  671  .0'

  T
  L-11420  OFFICE IF NEEDED  23

  G E
  EX. PIN

  O
  W

  RO
  EX. CONCRETE PAD AND
  P-53

  UE

  PP 8' E.SA GSW
  672  DRIVEWAY TO BE REMOVED

  0.
  UE
  EX. TREE TO BE

  691
  AD
  EX. TREES TO BE CLEARED. REFER  REMOVED (TYP.)

  EX 9' N
  OE
  UE

  5.8 /L
  .R .
  T
  TO SITE PLAN C-100 FOR LIMITS.

  ±O
  685

  EB
  2  7"

  (6
  12"

  AR
  UE
  67
  D  A
  AN E ARE
  10"

  UE

  6.0
  AREA OF DISTURBANCE  EX. SITE TO BE CLEARED AND  T
  = 7.42 AC.  EN AG
  GRUBBED WITHIN DISTURBANCE  IPM STOR

  SA SOE
  U
  LIMITS AS SHOWN  EQ IAL

  ')
  OE  694

  UE
  TER

  UE
  PP

  G
  T
  3  OE  PP
  67  MA  OE
  OE  1.0' E.

  W
  OE  EX. IP.

  14
  11
  INSTALL PROPOSED DETENTION BASIN DURING INITIAL PHASE  INSTALL ORANGE MESH PROTECTIVE  OE

  3 .8
  5
  PP  7.27' NW.

  °-0
  NW. COR. LOT 417  FENCING AROUND CEMETERY
  OF CONSTRUCTION TO ACT AS SEDIMENT BASIN. CLEAN TO

  6'
  UE

  4'- SA W
  PARKING

  1
  OE

  MS
  6 70
  DURING CONSTRUCTION.

  Multifamily Development
  DESIGN GRADE FOLLOWING STABILIZATION. INSTALL

  69

  47
  LOT

  OE

  .
  S. LINE LOT 369

  "
  4
  G
  692
  BIORETENTION SOIL AFTER SITE HAS BEEN STABILIZED.  CONTRACTOR TO SUBMIT SHOP

  9

  3

  69
  68

  69
  0
  W

  ST
  663  DRAWING PRIOR TO CONSTRUCTION

  688

  69
  12"

  UE

  5
  EX. IP.  7  A
  5

  RE
  66

  6

  69
  OE
  66

  .A

  66
N. INV: 660.98 (18" HDPE)  BIT
  675  12"  170°-37'-13"

  OE
  89°-57'-36"  674

  668
  673  HYD

  2
  672  APPROX. LOCATION

  68
  671
  680  EX. TREES TO BE REMOVED

  669

  WG
  670  OF CEMETERY

  SA S
  UE
  6"  HEAD STONES NOT  NE. INV: 680.89 (6" HDPE)
  LOCATED

  T OE
  673.50
  127°-49'-44"
  673.50
  14"
  28"  30"
  40"  14"

  674
  UE
  18"  EX. IP.
  W. INV: 682.97  NOTE: STUMPS AND BRUSH MAY NOT
  4  NW. INV: 673.14 (12" CMP)  7"  EX. TREE TO BE  BE BURIED IN THE TOWN AND
  66
  (12" HDPE)
  ST

  REMOVED (TYP.)  TOPSOIL MAY NOT BE REMOVED FROM
  EX. 6" PIPE TO
  23"  UE  EX. 12" PIPE TO  THE WORK SITE WITHOUT A PERMIT
  BE REMOVED

  1425 & 1475 Orchard Park Rd
  COM

  BE REMOVED  SW. INV: 680.34 (6" HDPE)
  12"  W. INV: 680.32 (6" HDPE)
  SE. INV: 673.26 (12" CMP)  30"  PARKING

  687
S. INV: 662.31 (18" HDPE)  LOT
  16"
  75
  UE

  670  6  34"

  686
  EX. IP.  E. INV: 680.75 (6" PVC)

  MATERIAL STORAGE AREA
  5  6  MS
  .

  683
  O/L
  66  67  18"
  68
  2  PART OF  &

  1
  D.

  4
  EQUIPMENT AND
  146°-28'-21"

  68
  W. LINE LOT 417

  1'

  68
  UE

  19"  L-11442, P-836  9.7

  5
  © CARMINA WOOD DESIGN

  68
  29
  7

  West Seneca, NY
  67  0
  68  TOTAL AREA =
  UE

  TOPSOIL STOCKPILE
  16.59 AC.  W/ SILT FENCE
  38"
  UE

  PART OF  EXCEPTION
  COM

  30"

  8

  690
  149°-26'-50"

  67
  11"  L-3327
  L-11442  10  24" EX. IP.  P-87
  PARKING
  666

  3.  2.04' NW.
  P-836
  UE

  LOT  00
  'D
  .&
  PARCEL "A"  M
  S.
  SCRUB SHRUB WETLANDS (PSS)  SILT FENCE/SILT SOCK  36"
  33
  (LIMIT OF DISTURBANCE)  EX. SITE TO BE CLEARED AND
  UE

  (APPROXIMATE LOCATION)  153°-18'-56"  5  8.

  "
  0'
  69
  14"

  10

  6/15/26
  GRUBBED WITHIN DISTURBANCE  D

  6'-
  .&
  6

  9

  °-4
  LIMITS AS SHOWN
  7

  24"
  66

  M

  Date
  67
  66

  S.

  89
  8"
  UE
  675

  668

  S.
  113°-43'-57"

  'M
  18"

  00
  0

  0

  3.

  Per Engineering comments
  70

  68

  11
  UE

  669
  COM

  5"

  T
  ND
  32"

  RA
  681

  .B
  UE

  EX. TREE TO BE

  NE
  670
  EX. REBAR

  No. Description
  LI
  REMOVED (TYP.)
  682

  S.
  N.

  M
  EXCEPTION

  .&
  'D
  12"

  REVISIONS:
  8"  11"
  O/L

  L-3036

  70
  2.
  12"  6" 8"
  671
  12"

  26
  7"  P-217
  20"  6"

  & 89'
  4

  3

  S.

  1
  68

  70
  6"  12"

  D. 72.
  M
  6"  13"
  2  6"
  67

  ')
  .0
  EX. IP.
  5
  68
  133°-32'-58"
  COM 670

  12.33' W.

  0
  673  5
  69

  (7
  EX. IP.
  3.20' S.
  275.56' D. & MS.

  AD
  674  700  710
  87°-23'-54"  705

  RO
  675  6
  20"  68
  7
  8

  68  9
  68  695
  68

N. INV: 669.78 (18" HDPE)

  RG
  676
  683
  1
  68

  BE
  EROSION CONTROL NOTES
  NOTES:
  THE FOLLOWING EROSION CONTROL PROCEDURES SHALL BE ADHERED TO BY THE CONTRACTOR:

  1.  INSTALL TEMPORARY SILT FENCE BARRIERS AS DIRECTED BY THE OWNER AND AT ALL EXISTING STORMWATER CATCH BASINS WITHIN THE WORK AREA TO PREVENT SEDIMENT MIGRATION. ALL
  Demo & Erosion Control Plan  1.  THE CONTRACTOR SHALL TAKE PRECAUTIONS TO PROTECT THOSE ITEMS TO REMAIN, SUCH AS TREES, PROPERTY CORNER
  PINS, UTILITY POLES, VALVES, HYDRANTS, CURBS, MANHOLES AND CATCH BASINS.
  SILT FENCE BARRIERS SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS SHOWN ON THE PLANS.
  SCALE: 1"=50'  2.  TEMPORARY SILT FENCE AND STRAW BALES TO BE INSTALLED AS DIRECTED BY THE OWNERS FIELD REPRESENTATIVE.
  2.  TOPSOIL SHALL BE STRIPPED AND STOCKPILED ON SITE FOR RE-USE AS DIRECTED BY THE OWNER. ALL LOCAL ORDINANCES REGARDING THE SALE OF TOPSOIL MUST BE FOLLOWED. TOPSOIL MAY  MAINTAIN UNTIL VEGATATION IS ESTABLISHED AND PAVEMENT IS INSTALLED.
  NOT BE REMOVED WITHOUT A PERMIT.
  3.  FOR THOSE STRUCTURES TO BE DEMOLISHED, ALL EXISTING UTILITY SERVICES SHALL BE ABANDONED IN ACCORDANCE WITH
  3.  ALL SILT FENCE BARRIERS SHALL BE REPLACED WHEREVER THEY BECOME CLOGGED OR INOPERABLE.  LOCAL REGULATIONS, ALL METERS SHALL BE RETURNED TO PROPER OWNERS.

  4.  THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE AND REMOVAL OF TEMPORARY SEDIMENTATION CONTROLS.  4.  THE CONTRACTOR SHALL INSTALL STABILIZED CONSTRUCTION ENTRANCES WHERE ACCESSING THE SITE FROM PAVED
  ROADWAYS.  DEMO & EROSION CONTROL LEGEND:  DRAWING NAME:
  5.  THE CONTRACTOR MUST CONTROL DUST DURING CONSTRUCTION. DURING EARTHWORK OPERATIONS, WATER-SPREADING EQUIPMENT SHALL BE PROVIDED BY THE CONTRACTOR, AND SPREAD
  WATER AS NECESSARY AND AS DIRECTED BY THE OWNER IN ORDER TO CONTROL DUST.  5.  THE CONTRACTOR SHALL INSTALL TEMPORARY TRAFFIC CONTROL DEVICES IN ACCORDANCE WITH NYS M.U.T.C.D.
  STANDARDS PRIOR TO STARTING WORK.  INSTALL STORM DRAINAGE INLET PROTECTION
  Demo & Erosion
  6.  DIRT OR DEBRIS LEFT ON LOCAL PUBLIC ROADS AS A RESULT OF THIS CONSTRUCTION PROJECT SHALL BE REMOVED AND ROAD SURFACES CLEANED BY THE CONTRACTOR ON A DAILY BASIS.
  6.  STUMPS AND BRUSH MAY NOT BE BURIED IN THE TOWN AND TOPSOIL MAY NOT BE REMOVED FROM THE WORK SITE WITHOUT
  Control Plan
  7.  ALL DISTURBED AREAS (EXCEPT AREAS TO BE PAVED OR BUILT UPON) SHALL BE TOPSOILED TO A MINIMUM 4" DEPTH AND SEEDED IMMEDIATELY AFTER FINE GRADING TAKES PLACE AND AS SOON  A PERMIT
  AS PHYSICALLY POSSIBLE.  PROPOSED SILT FENCE/SILT SOCK

  8.  THE CONTRACTOR IS RESPONSIBLE FOR THE MAINTENANCE OF DOWNSTREAM STORM SEWERS, DITCHES, AND CULVERTS. SILT BUILDUP FOUND TO BE A RESULT OF THIS SITE CONSTRUCTION
  WORK SHALL BE REMOVED FROM DOWNSTREAM CULVERTS BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER OR THE TOWN/CITY.
  Date:  5/22/26
  AREA OF DISTURBANCE
  9.  ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES AND MATERIALS SHALL BE IN PLACE PRIOR TO BEGINNING EARTHWORK OPERATIONS AND SHALL BE MAINTAINED UNTIL THE NEW SLOPES ARE  Drawn By:  A. Pandolfe
  STABILIZED WITH SEEDING AND/OR SLOPE PROTECTION, AS DIRECTED BY THE ENGINEER.  Scale:  As Noted

  10. INSTALL TEMPORARY SILT FENCE AROUND THE BASE OF STOCKPILES.
  DRAWING NO.

  11. THE PROFESSIONAL CERTIFYING COMPLIANCE TO NYSDEC PHASE II STORMWATER REGULATION REQUIREMENTS MUST INSPECT AT A MINIMUM WEEKLY AND SHALL PROVIDE THESE INSPECTION
  REPORT WITH A WRITTEN CERTIFICATION OF CONSTRUCTION COMPLIANCE TO THE
  WEST
  TOWN
  SENECA
  OF WEEKLY.

  12. THE ENGINEER OF RECORD FOR THIS PROJECT CERTIFIES THAT THESE DESIGN PLANS MEET THE REQUIREMENTS AND ARE IN COMPLIANCE WITH THE NEW YORK STORMWATER MANAGEMENT
  DESIGN MANUAL AND NYSDEC PHASE II STORMWATER REGULATION REQUIREMENTS. DUE TO SOIL DISTURBANCE BEING GREATER THAN ONE ACRE, A NYSDEC SPDES PERMIT MUST BE OBTAINED
  NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
  CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
  50  0  50  100Ft.
  C-001
  50'  Project No:  23-4121
  BEFORE ANY ON-SITE DISTURBANCE IS MADE.

  Page 1139 of 1493