Text · page 1149 of 1493
Read the whole document on one page (all 1493 pages, each with its own heading)
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration. All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145 Greensboro UE G UE EX. PIN CB W RIM:683.34 Utica APPROX. LOCATION G N. INV:672.94 (18") ST UE S. INV:673.10 (18") OE SA CB W Buffalo 2" RIM:680.53 G 3 8'- UE N. INV:671.23 (18") EX 5A' N . CB °-5 OE ST W 5.2 S 2' E OE 0 S. INV:671.23 (18") .N . 0 RIM:685.39 0.3G 1 AI C.O. N. INV:677.49 (18") L UE CONNECT DOWNSPOUTS TO 6" HDPE PERIMETER 87°-09'-45" S. INV:677.49 (16") UE DRAIN @ 1.0%. COORDINATE DOWNSPOUT YD 4 E. INV:676.99 (4") W LOCATIONS WITH ARCHITECTURAL PLANS. STG RIM 680.20 OR INV 678.70 UE UE SA OT MH OE L IT. RIM:685.89 W CB 6 C.O. B NW. INV:676.14 (12") CH G RIM 679.00 UE INV 676.80 SE. INV:676.22 (12") SA Multifamily Development 1 .0 130 LF 6" W PP . OE AR HDPE @ 0.5% G CB 1 'E CONNECT DOWNSPOUTS TO 6" HDPE PERIMETER UE PRO RIM 683.25 ST DRAIN @ 1.0%. COORDINATE DOWNSPOUT PO W/A F.F.E EX. REBAR LOCATIONS WITH ARCHITECTURAL PLANS. INV 681.00 SED TT . = 126 LF 8" 4.11' N. 1-S ACH 681 W HDPE @ 0.5% OE D TO ED .60 SA C.O. C.O. G UE R Y GA 100 LF 8" 5-U RAG HDPE @ 0.7% C.O. NIT ES PA BU W 113°-18'-53" OE ILD CB 7 UE G IN G# RIM 678.80 SA 2 INV 676.30 RK C.O. C.O. YD 5 CONNECT DOWNSPOUTS TO 6" HDPE PERIMETER SWT OE RIM 680.20 DRAIN @ 1.0%. COORDINATE DOWNSPOUT PROPOSED 1-STORY 4-UNIT BUILDING #3 UE 1425 & 1475 Orchard Park Rd INV 678.05 G 32 LF 6" HDPE ROOF CB 2 LOCATIONS WITH ARCHITECTURAL PLANS. 51 LF 12" EX. PIN RIM 683.25 LEADER @ 1.0% C.O. #1 W/ATTACHED GARAGES HDPE @ 0.5% INV 680.30 NE, SE RO G 82 LF 12" DIN SA GS F.F.E. = 681.15 CONNECT DOWNSPOUTS TO 6" HDPE PERIMETER INV 677.97 SW I L OE PP 8' E. W HDPE @ 0.3% CB 5 BU UE DRAIN @ 1.0%. COORDINATE DOWNSPOUT C.O. 52 LF 6" NIT AGES 0. YD 7 RIM 679.80 PROPOSED 1-STORY 4-UNIT BUILDING #4 LOCATIONS WITH ARCHITECTURAL PLANS. HDPE @ 0.5% U -4 R T RIM 680.00 INV 676.17 32 LF 6" HDPE ROOF O RY D GA 80 T E . YD 1 1-S ACH = 684 AD INV 675.92 LEADER @ 1.0% E D TT . RIM 683.70 © CARMINA WOOD DESIGN S OE W/ATTACHED GARAGES YD 6 PO W/A F.F.E W EX 9' N INV 681.98 UE O RIM 680.20 PR SA West Seneca, NY 5.8 /L W G G F.F.E. = 680.40 C.O. C.O. .R . INV 677.28 12"x6" TEE ±OST E CB 8 EB RIM 678.80 STOP INV 677.79 (6 INV 676.05 AR O UE 30 LF 6" HDPE ROOF 17 LF 6" HDPE ROOF 66 LF 6" LEADER @ 1.0% 132 LF 12" LEADER @ 1.0% HDPE @ 0.5% 6.0 HDPE @ 0.7% SA 46 LF 6" HDPE @ 0.5% 149 LF 8" YD 2 UE ST 71 LF 12" HDPE @ 0.8% RIM 683.70 HDPE @ 0.5% W C.O. C.O. INV 681.65 ') CB 3 OE OE 32 LF 6" HDPE ROOF RIM 682.15 PP G 63 LF 12" 70 LF 8" OE LEADER @ 1.0% INV 679.90 E C.O. OE OE PP HDPE @ 0.5% HDPE @O0.8% E 1.0' E. SA UE 148 LF 12" INV 677.05 NE, NW, W OE 32 LF 6" HDPE ROOF OE OE EX. IP. 11 HDPE @ 1.0% OE YD 3 LEADER @ 1.0% WST BIORETENTION AREA #1 OE OE RIM 684.00 5° PP 7.27' NW. 6/18/26 2,855 S.F. CB 4 OE INV 681.09 -0 G (2,850 S.F. REQUIRED) RIM 679.90 Date 4'- SA C.O. C.O. PARKING TOP ELEV = 673.50 INV 675.57 47 YD 12-15 (TYP.) RIM 673.50 BOTTOM ELEV = 673.00 STOP LOT " W 30 LF 6" PERF. 131 LF 15" OE OE INV 669.67 HDPE @ 0.0% 121 LF 18" STM MH 1 HDPE @ 1.0% G HDPE @ 1.0% RIM 679.20 ST INV 675.74 N 12" Per Engineering comments 31 LF 6" W A 48 LF 6" HDPE ROOF INV 674.21 SW, E RE OE HDPE @ 0.3% EX. PIPE TO DISCHARGE .A OE W LEADER @ 1.0% DIRECTLY TO CB 12 BIT SA 12" 170°-37'-13" OE HYD ST G E APPROX. LOCATION CB 12 No. Description 18"x6" TEE CONTRACTOR TO VERIFY LIMITS OF O W INV 673.83 OF CEMETERY CEMETERY AND NOTIFY DESIGN RIM 682.90 INV 679.28 REVISIONS: END SECTION ENGINEER OF ANY POTENTIAL CONFLICTS INV 673.00 HEAD STONES NOT SA 673.50 LOCATED 127°-49'-44" G OE W YD 16-18 (TYP.) 1 673.50 ST RIM 673.50 14" INV 669.67 28" 14" END SECTION EX. IP. INV 673.00 W. INV: 682.97 355 LF 12" HDPE @ 1.0% EX. STORM SEWER TO BE (12" HDPE) 12" E-W INV 675.41 48 LF 12" 12" NW-SE INV 673.40 RE-ROUTED. END SECTION INV 669.57 HDPE @ 1.1% 73 LF 12" HDPE @ 1.0% EX. STORM SEWER TO BE 31 LF 6" RE-ROUTED. HDPE @ 0.3% TOP OF CB 10 STM MH 2 POND 675.30 BIORETENTION AREA #2 END SECTION PARKING 1,700 S.F. CB 11 12"x6" TEE 123 LF 12" RIM 679.50 RIM 683.00 INV 675.00 RIM 678.00 INV 675.98 HDPE @ 1.1% INV 676.83 INV 678.55 (1,620 S.F. REQUIRED) INV 675.48 E LOT TOP ELEV = 673.50 BOTTOM ELEV = 673.00 INV 673.53 NW STORMWATER RUNOFF SUMMARY Drainage Plan - North TO DETENTION: PROPOSED UTILITY LEGEND PROPOSED STORM SEWER ST SCALE: 1"=30' EVENT PROP. RUNOFF (CFS) ELEVATION (FEET) STORAGE (CF) 1-YEAR 1.83 670.86 4,596 10-YEAR 2.80 672.91 14,741 PROPOSED SANITARY SEWER 6" SA DRAWING NAME: 25-YEAR 3.08 673.66 20,871 100-YEAR 3.43 674.69 34,430 Drainage PROPOSED WATERLINE 1" W DIRECT: Plan - North EVENT PROP. RUNOFF (CFS) PROPOSED CATCH BASIN CB 1-YEAR 0.38 10-YEAR 1.12 25-YEAR 1.57 PROPOSED YARD DRAIN YD 100-YEAR 2.52 Date: 5/22/26 Drawn By: A. Pandolfe TOTAL SITE: PROPOSED MANHOLE MH Scale: As Noted EVENT EX. RUNOFF (CFS) PROP. RUNOFF (CFS) DRAWING NO. 1-YEAR 2.63 1.87 PROPOSED HYDRANT ASSEMBLY 10-YEAR 8.17 2.89 25-YEAR 100-YEAR 11.66 18.97 3.23 4.61 PROPOSED GATE VALVE NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A 3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE GV NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS, CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. 30 0 30 60Ft. C-301 Project No: 23-4121 COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE 30' BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK. Page 1149 of 1493