6.2.3  Post Construction Records and Archiving

 Following construction, the Owner/Operator shall retain copies of the SWPPP, the complete
 construction Site Log Book, and records of all data used to complete the NOI to be covered by this
 permit, for a period of at least five years from the date that the site is finally stabilized. This period may
 be extended by the NYSDEC, at its sole discretion, at any time upon written notification.

 Records shall be maintained of all post construction inspections and maintenance work performed in
 accordance with the requirements outlined in Appendix G.

 7.0  SWPPP IMPLEMENTATION RESPONSIBILITIES
 A summary of the responsibilities and obligations of all parties involved with compliance with the
 NYSDEC SPDES General Permit GP-0-25-001 conditions is outlined in the subsequent sections. For a
 complete listing of the definitions, responsibilities, and obligations, refer to the SPDES General Permit
 GP-0-25-001 presented in Appendix J.

 7.1 Owner’s/Operator's Responsibilities

  1. Ensure that control measures are selected, designed, installed, implemented and maintained
  to minimize the discharge of pollutants and prevent a violation of the water quality standards,
  meeting the non-numeric effluent limitations in Part II.B.1.(a)-(e) of the SPDES General Permit
  and in accordance with the New York State Standards and Specifications for Erosion and
  Sediment Control, dated November 2016.

  2. Ensure that practices are selected, designed, installed, and maintained to meet the
  performance criteria in the Design Manual. Practices must be designed to meet the applicable
  sizing criteria in Part II.C.2.a., b., c. or d. of GP-0-25-001.

  3. Retain the services of a “Qualified Inspector” or “Qualified Professional” as defined under GP-
  0-25-001, to provide the services outlined in Section 7.5 “Qualified Inspector’s/Qualified
  Professional’s Responsibilities.”

  4. Retain the services of a “Qualified Professional,” as defined under GP-0-25-001, to provide
  the services outlined in Section 2.3 “Owner’s/Operator’s Engineers Responsibilities.”

  5. Have an authorized corporate officer sign the Owner/Operator Certification Form to
  accompany the eNOI. A copy of the completed NOI is included in Appendix B.

  6. Submit the electronic version of the NOI (eNOI) along with the MS4 SWPPP acceptance form
  using the NYSDEC’s website (http://www.dec.ny.gov/chemical/43133.html).

  7. Pay the required initial and annual fees upon receipt of invoices from NYSDEC. These invoices
  are generally issued in the fall of each year. The initial fee is calculated as $110.00 per acre
  disturbed plus $675.00 per acre of net increase in impervious cover, and the annual fee is
  $110.00.

  8. Prior to the commencement of construction activity, identify the contractor(s) and
  subcontractor(s) that will be responsible for installing, constructing, repairing, replacing,
  inspecting, and maintaining the erosion control practices included in the SWPPP and the

Stormwater Pollution Prevention Plan