6.2.3 Post Construction Records and Archiving Following construction, the Owner/Operator shall retain copies of the SWPPP, the complete construction Site Log Book, and records of all data used to complete the NOI to be covered by this permit, for a period of at least five years from the date that the site is finally stabilized. This period may be extended by the NYSDEC, at its sole discretion, at any time upon written notification. Records shall be maintained of all post construction inspections and maintenance work performed in accordance with the requirements outlined in Appendix G. 7.0 SWPPP IMPLEMENTATION RESPONSIBILITIES A summary of the responsibilities and obligations of all parties involved with compliance with the NYSDEC SPDES General Permit GP-0-25-001 conditions is outlined in the subsequent sections. For a complete listing of the definitions, responsibilities, and obligations, refer to the SPDES General Permit GP-0-25-001 presented in Appendix J. 7.1 Owner’s/Operator's Responsibilities 1. Ensure that control measures are selected, designed, installed, implemented and maintained to minimize the discharge of pollutants and prevent a violation of the water quality standards, meeting the non-numeric effluent limitations in Part II.B.1.(a)-(e) of the SPDES General Permit and in accordance with the New York State Standards and Specifications for Erosion and Sediment Control, dated November 2016. 2. Ensure that practices are selected, designed, installed, and maintained to meet the performance criteria in the Design Manual. Practices must be designed to meet the applicable sizing criteria in Part II.C.2.a., b., c. or d. of GP-0-25-001. 3. Retain the services of a “Qualified Inspector” or “Qualified Professional” as defined under GP- 0-25-001, to provide the services outlined in Section 7.5 “Qualified Inspector’s/Qualified Professional’s Responsibilities.” 4. Retain the services of a “Qualified Professional,” as defined under GP-0-25-001, to provide the services outlined in Section 2.3 “Owner’s/Operator’s Engineers Responsibilities.” 5. Have an authorized corporate officer sign the Owner/Operator Certification Form to accompany the eNOI. A copy of the completed NOI is included in Appendix B. 6. Submit the electronic version of the NOI (eNOI) along with the MS4 SWPPP acceptance form using the NYSDEC’s website (http://www.dec.ny.gov/chemical/43133.html). 7. Pay the required initial and annual fees upon receipt of invoices from NYSDEC. These invoices are generally issued in the fall of each year. The initial fee is calculated as $110.00 per acre disturbed plus $675.00 per acre of net increase in impervious cover, and the annual fee is $110.00. 8. Prior to the commencement of construction activity, identify the contractor(s) and subcontractor(s) that will be responsible for installing, constructing, repairing, replacing, inspecting, and maintaining the erosion control practices included in the SWPPP and the Stormwater Pollution Prevention Plan Page 26 2241067 Page 116 of 1493