Text · page 1195 of 1493
Read the whole document on one page (all 1493 pages, each with its own heading)
F. Air conditioning condensate. G. Springs or other uncontaminated groundwater, including dewatering ground water infiltration. H. Foundation or footing drains where no contamination with process materials such as solvents is present. Note: The Contractor shall discharge any super-chlorinated water from water distribution pipe disinfection activities into sanitary sewer system 120 STORM WATER CONTROL FACILITY MAINTENANCE The frequency of inspections for the bioretention areas shall match the frequencies listed on the “Bioretention Operation, Maintenance and Management Inspection Checklist” in Appendix L of the SWPPP. The proposed catch basins, as per section 115, shall be inspected 4 times per year for removal of floatable debris. Any silt buildup over 6” in depth shall be removed and disposed of properly off-site. Multifamily Development 6/17/26 Page 23 of 23 Page 1195 of 1493