Text · page 121 of 1493
Read the whole document on one page (all 1493 pages, each with its own heading)
all repairs/maintenance activities performed. This information must be retained as part of the Site Log Book. 9. Begin implementing corrective actions within one (1) business day of receipt of notification by the Qualified Inspector/Qualified Professional of any corrective actions. For corrective actions not requiring engineering design, the contractor must begin implementing corrective actions within one business day and complete the corrective actions within five business days. For corrective actions requiring engineering design, the engineering design process must begin within five business days and the contractor must complete the corrective action in a reasonable time frame but no later than 60 calendar days. 10. Maintain a record of the date(s) and location(s) that soil restoration is performed in accordance with the accompanying plans and NYSDEC Division of Water’s publication “Deep-Ripping and Decompaction,” dated April 2008. A copy of this publication is provided in Appendix H. The record that is to be maintained shall be a copy of the overall site grading plan delineating the area(s) and date(s) that the soil was restored. 11. Upon completion of all construction at the site, the contractor responsible for overall SWPPP Compliance shall sign the certification on their Contractor Certification Form indicating that: a.) all temporary erosion and sediment control measures have been removed from the site, b.) the on-site soils disturbed by construction activity have been restored in accordance with the SWPPP and the NYSDEC Division of Water’s publication “Deep-Ripping and Decompaction,” and c.) all permanent stormwater management practices required by the SWPPP have been installed in accordance with the contract documents. 7.4 Qualified Inspector’s/Qualified Professional’s Responsibilities 1. Participate in a pre-construction meeting with the Town of West Seneca representative, Owner/Operator, Owner/Operator’s Engineer, Contractor, and their subcontractors to discuss responsibilities as they relate to the implementation of this SWPPP. 2. Conduct an initial assessment of the site prior to the commencement of construction and certify in an inspection report that the appropriate erosion and sediment control measures described within this SWPPP have been adequately installed and implemented to ensure overall preparedness of the site. 3. Provide on-site inspections to determine compliance with the SWPPP. Site inspections shall occur at an interval of at least once every seven calendar days. A written inspection report shall be provided to the Owner/Operator and general contractor within one business day of the completion of the inspection, with any deficiencies identified. A sample inspection form is provided in Appendix F. 4. Prepare an inspection report subsequent to each and every inspection that shall include/address the items listed in Part IV.C.4 of GP-0-25-001. Sign all inspection reports and maintain on site with the SWPPP. 5. Notify the owner/operator and appropriate contractor or subcontractor of any corrective actions that need to be taken. Stormwater Pollution Prevention Plan Page 31 2241067 Page 121 of 1493