Text · page 1292 of 1493
Read the whole document on one page (all 1493 pages, each with its own heading)
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14" Prepared by Carmina Wood Design Printed 6/18/2026 HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 20 Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Proposed - North Runoff Area=159,502 sf 51.54% Impervious Runoff Depth=2.03" Flow Length=738' Tc=24.8 min CN=89 Runoff=7.22 cfs 26,940 cf Subcatchment 2S: Proposed - South Runoff Area=93,939 sf 49.41% Impervious Runoff Depth=2.03" Flow Length=627' Tc=19.8 min CN=89 Runoff=4.85 cfs 15,867 cf Subcatchment 3S: Direct Runoff Area=21,732 sf 0.00% Impervious Runoff Depth=1.36" Flow Length=58' Tc=7.8 min CN=80 Runoff=1.12 cfs 2,456 cf Pond 1P: Bioretention #1 Peak Elev=674.22' Storage=2,876 cf Inflow=7.22 cfs 26,940 cf Primary=3.08 cfs 21,913 cf Secondary=6.13 cfs 3,688 cf Outflow=9.21 cfs 25,600 cf Pond 2P: Bioretention #2 Peak Elev=674.14' Storage=1,717 cf Inflow=4.85 cfs 15,867 cf Primary=3.05 cfs 14,217 cf Secondary=3.26 cfs 858 cf Outflow=6.31 cfs 15,075 cf Pond 3P: Detention Pond Peak Elev=672.91' Storage=14,741 cf Inflow=15.52 cfs 40,675 cf Outflow=2.80 cfs 40,675 cf Link 3L: Proposed - Total Inflow=2.89 cfs 43,131 cf Primary=2.89 cfs 43,131 cf Total Runoff Area = 275,173 sf Runoff Volume = 45,263 cf Average Runoff Depth = 1.97" 53.25% Pervious = 146,543 sf 46.75% Impervious = 128,630 sf Page 1292 of 1493