Text · page 1305 of 1493
Read the whole document on one page (all 1493 pages, each with its own heading)
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84" Prepared by Carmina Wood Design Printed 6/18/2026 HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 33 Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Proposed - North Runoff Area=159,502 sf 51.54% Impervious Runoff Depth=2.67" Flow Length=738' Tc=24.8 min CN=89 Runoff=9.47 cfs 35,532 cf Subcatchment 2S: Proposed - South Runoff Area=93,939 sf 49.41% Impervious Runoff Depth=2.67" Flow Length=627' Tc=19.8 min CN=89 Runoff=6.35 cfs 20,927 cf Subcatchment 3S: Direct Runoff Area=21,732 sf 0.00% Impervious Runoff Depth=1.91" Flow Length=58' Tc=7.8 min CN=80 Runoff=1.57 cfs 3,459 cf Pond 1P: Bioretention #1 Peak Elev=674.23' Storage=2,876 cf Inflow=9.47 cfs 35,532 cf Primary=3.08 cfs 27,057 cf Secondary=6.47 cfs 7,134 cf Outflow=9.55 cfs 34,192 cf Pond 2P: Bioretention #2 Peak Elev=674.16' Storage=1,717 cf Inflow=6.35 cfs 20,927 cf Primary=3.05 cfs 17,745 cf Secondary=3.75 cfs 2,390 cf Outflow=6.81 cfs 20,135 cf Pond 3P: Detention Pond Peak Elev=673.66' Storage=20,871 cf Inflow=16.28 cfs 54,327 cf Outflow=3.08 cfs 54,327 cf Link 3L: Proposed - Total Inflow=3.23 cfs 57,786 cf Primary=3.23 cfs 57,786 cf Total Runoff Area = 275,173 sf Runoff Volume = 59,918 cf Average Runoff Depth = 2.61" 53.25% Pervious = 146,543 sf 46.75% Impervious = 128,630 sf Page 1305 of 1493