SITE INFORMATION
  APPLICANT:
  NEW LEAF ENERGY, INC.
  55 TECHNOLOGY DRIVE, SUITE #102 ,
  LOWELL, MA 01851

  OWNER:
  W  GLR HOLDINGS, LLC
  180 CANAL VIEW BLVD, SUITE 600

  NAD83

  NAD83
  E  ROCHESTER, NY 14623

  SITE NOTES  (REV. 5/2024)

  S  1.  ALL CONCRETE MUST BE AIR ENTRAINED AND INCLUDE THE MINIMUM COMPRESSIVE STRENGTH OF JURISDICTIONAL
  STANDARD PSI AT 28 DAYS (OR 4,000 PSI) UNLESS OTHERWISE NOTED ON THE PLANS, DETAILS AND/OR
  GEOTECHNICAL REPORT. IF THERE ARE ANY DISCREPANCIES BETWEEN THE PLANS, DETAILS AND GEOTECHNICAL
  REPORT THEN THE GEOTECHNICAL REPORT SHALL GOVERN.

  2.  THE CONTRACTOR MUST REPAIR OR REPLACE, AT THE CONTRACTOR'S SOLE COST AND EXPENSE, ALL SIDEWALKS,
  CURBS, PAVEMENT MARKINGS, AND PAVEMENT DAMAGED BY CONSTRUCTION ACTIVITIES WHETHER SPECIFIED ON
  THIS PLAN OR NOT.

  3.  CONTRACTOR IS CAUTIONED OF EXISTING UTILITY SERVICES TO REMAIN IN PROXIMITY TO PROPOSED BOLLARDS AND
  SIGNS. CONTRACTOR SHALL PROVIDE FIELD MODIFICATION LOCATIONS OF BOLLARDS AND BOLLARDS WITH SIGNAGE
  AS NEEDED TO AVOID CONFLICTS WITH EXISTING UTILITY SERVICES TO REMAIN.

  .com
  UTILITY NOTES

  ROCHESTER, NY 14625

  www.BohlerEngineering
  (REV. 7/2024)

  (585) 866-1100
  70 LINDEN OAKS
  1.  ALL WORK ASSOCIATED WITH UTILITY POLES, OVERHEAD WIRES AND ANY/ALL APPURTENANCES SHALL BE

  THIRD FLOOR
  COORDINATED BY THE GC WITH THE LOCAL UTILITY COMPANIES PRIOR TO THE ORDERING OF ANY MATERIALS. THIS
  MAY INCLUDE BUT IS NOT LIMITED TO THE REMOVAL, INSTALLATION, RELOCATION OR PROTECTION OF ANY BRACING,
  GUY WIRES, OVERHEAD WIRES, ETC. AS MAY BE REQUIRED TO ACCOMMODATE THE PROJECT.

  2.  TRANSFORMERS AND SWITCH GEARS: GC SHALL PROVIDE ALL APPURTENANCES IN ACCORDANCE WITH UTILITY
  COMPANY SPECIFICATIONS AND CARRY SAME IN BASE BID. APPURTENANCES SHALL INCLUDE, BUT NOT BE LIMITED
  TO, THE CONCRETE PAD, SECONDARY SPILL CONTAINMENT AREAS (IF REQUIRED), BOLLARD / VEHICULAR

  Phone:
  PROTECTION, AND OTHER ITEMS AS MAY BE REQUIRED BY THE UTILITY PROVIDER FOR INSTALLATION OF THE
  TRANSFORMER AND SWITCH GEAR (IF REQUIRED). GC SHALL COORDINATE ALL ASPECTS OF INSTALLATION WITH
  UTILITY PROVIDER PRIOR TO ORDERING OF MATERIALS AND NOTIFY DESIGN ENGINEER OF ANY CONFLICTS IN
  WRITING.

  ORCHARD PARK ROAD
  138.00'
  N 80°00'37" N
  3.5'

  4'

  4'
  22.2'  GREEN AREA

  PROP EOP

  GREEN AREA
  PROP EOP

  S 09°36'27" E
  20'
  45.00'

  PROP PANEL BOARD,
  PROP ASPHALT PAVEMENT (TYP)

  45.00'
  PROP UTILITY POLE  METER, & SWITCHBOARD  PROP CANTILEVERED EV
  ON 7'X17.25' CONCRETE PAD  CHARGING CANOPY

  PROPOSED EV CHARGING STATIONS
  PROP 4" PAVEMENT STRIPE
  PROP 6"  PROP STRIPED
  PAINTED WHITE (TYP)
  BOLLARD (TYP)  LOADING AREA

  11'  3'R
  PROP GRAVEL AREA

  WEST SENECA, NY 14224
  705 ORCHARD PARK RD
  8'  6.6'
  8'  10'  10'
  18'

  18'
  PROP 6"  GREEN AREA
  BOLLARD (TYP)
  8'

  3'

  3'
  3.7'  138.00'
  PROP TRANSFORMER  S 80°00'37" W  12.00'
  ON CONCRETE PAD  PROP CANOPY COLUMN (TYP)  PROP DUAL PORT EV CHARGER
  PROP EV CHARGING SIGN  PROP EV CHARGING SIGN (TYP)
  ON CONRETE PAD (TYP OF 5)
  & LAST USE SIGN (TYP)

  THIS PLAN TO BE UTILIZED
  ALWAYS CALL 811  FOR SITE LAYOUT PURPOSES
  It's fast. It's free. It's the law.  ONLY
  GENERAL NOTE:
 IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT
WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO
 THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN
  10  5  2.5  0

  1"= 10'
  10
  C-2.1
  WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE
ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN  SITE PLAN
  FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES.

  Page 15 of 1493