Southtowns Record

PBA07.09.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jul 9, 2026, 6:00 p.m.
Posted by publisher
Jul 9, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 209 of 1493

Read the whole document on one page (all 1493 pages, each with its own heading)

E_App E_Post-Development Model  NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates  Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC  Page 9

  Summary for Subcatchment PS-4:

Runoff  =  1.28 cfs @ 12.04 hrs, Volume=  0.065 af, Depth= 1.15"
  Routed to Pond BIO-3 : Filtration Bioretention

Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"

  Area (sf)  CN  Description
  20,928  98  Paved parking, HSG D
  8,557  80  >75% Grass cover, Good, HSG D
  29,485  93  Weighted Average
  8,557  29.02% Pervious Area
  20,928  70.98% Impervious Area

  Tc Length  Slope Velocity Capacity Description
  (min) (feet)  (ft/ft) (ft/sec) (cfs)
  6.0  Direct Entry, Direct

  Subcatchment PS-4:
  Hydrograph

  Runoff
  1.28 cfs
  NY-West Seneca 24-hr S1 1-yr
  Rainfall=1.82"
  Runoff Area=29,485 sf
  1
  Runoff Volume=0.065 af
  Runoff Depth=1.15"
  Flow (cfs)

  Tc=6.0 min
  CN=93

  0
  0  2 4  6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
  Time (hours)

  Page 209 of 1493