Text · page 272 of 1493
Read the whole document on one page (all 1493 pages, each with its own heading)
E_App E_Post-Development Model Multi-Event Tables Prepared by Labella Associates Printed 4/20/2026 HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 72 Events for Pond BIO-2: Filtration Bioretention Event Inflow Outflow Primary Secondary Tertiary Elevation Storage (cfs) (cfs) (cfs) (cfs) (cfs) (feet) (cubic-feet) 1-yr 0.74 0.02 0.02 0.00 0.00 596.95 1,010 10-yr 1.75 1.06 0.02 1.04 0.00 597.12 1,319 100-yr 3.52 3.26 0.02 3.23 0.00 597.25 1,582 Page 272 of 1493