Southtowns Record

PBA07.09.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jul 9, 2026, 6:00 p.m.
Posted by publisher
Jul 9, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 291 of 1493

Read the whole document on one page (all 1493 pages, each with its own heading)

BR Inlets
Stand in the Bioretention cell itself and look for all the places where water flows in. Often there will be multiple points of inflow to the
practice.
Problem (Check if Present)  Follow-Up Actions

    Use a flat shovel to remove grit and debris (especially at curb inlets
  or openings). Parking lots generate fine grit that will accumulate at
  these spots.
    Pull out clumps of growing grass or weeds and scoop out the soil or grit
  that the plants are growing in.
    Remove any grass clippings, leaves, sticks, and other debris that is
  collecting at inlets.
    For pipes and ditches, remove sediment and debris that is partially
  blocking the pipe or ditch opening where it enters the Bioretention cell.
    Dispose of all material properly where it will not re-enter the
  Bioretention cell.
    Other:

   Inlets collect grit and debris or grass/weeds.
  Some water may not be getting into the
  Bioretention cell. The objective is to have a
  clear pathway for water to flow into the cell.
    Kick-Out to Level 2 Inspection: Inlets are blocked to the extent that most
  of the water does not seem to be entering the Bioretention cell.

    For small areas of erosion, smooth out the eroded part and apply rock or
  stone (e.g., river cobble) to prevent further erosion. Usually, filter fabric is
  placed under the rock or stone.
    In some cases, reseeding and applying erosion-control matting can be
  used to prevent further erosion. Some of these materials may be available
  at a garden center, but it may be best to consult a landscape contractor.
    Other:

    Kick-Out to Level 2 Inspection: Erosion is occurring at most of the inlets,
   Some or all of the inlets are eroding so that  and it looks like there is too much water that is concentrating at these
  rills, gullies, and other erosion is present, or  points. The inlet design may have to be modified.
  there is bare dirt that is washing into the
  Bioretention cell.

  Page 3 of 8

  Page 291 of 1493