ENGINEERING.ARCHITECTURE.ENVIRONMENTAL.PLANNING  Job # 2241067
300 State Street, Suite 201 ● Rochester, NY 14614  Project: West Seneca Apartments
Phone 585.454.6110 ● Fax 585.454.3066  Date: 6/15/2026
www.labellapc.com  By: JB

Location: West Seneca, NY
Design Storm Event: 10-Year
Roughness Coefficient, N =  0.013

  Storm Sewer Sizing Calculations, Run 01
  Area  Time of  Pipe  Pipe  Pipe  Partially  Velocity  Time of  Pipe  Pipe  Wetted Hydraulic  Qmax
  From  To  Area  Coefficient  Equivalent  Accum.  Intensity  Q = CIA
  Number  Concentration  Dia.  Length  Slope  Full Pipe  at Reqd.  Flow  Dia.  Area  Perimeter Radius  (Full Pipe)
  ST  ST  (see map)  (Ac)  of Runoff  Area (Ac)  Area (Ac)  (min)  (in/hr)  (cfs)  (in.)  (ft)  (%)  Area (sf)  (fps)  (min)  (ft)  (sf)  (ft)  (ft)  (cfs)
  ST-3.4  ST-3.3  1 ST-3.4  0.21  0.84  0.17  0.31  6.00  12.19  3.77  18  150  0.90%  0.67  5.7  0.44  1.50  1.767  4.712  0.375  9.99  PASS
  ST-3.3  ST-3.2  2 ST-3.3  0.12  0.86  0.10  0.50  10.00  9.52  4.80  18  102  0.90%  0.85  5.7  0.30  1.50  1.767  4.712  0.375  9.99  PASS
  ST-3.2  ST-3.1  3 ST-3.2  0.38  0.74  0.28  0.79  10.30  9.37  7.38  18  85  2.00%  0.88  8.4  0.17  1.50  1.767  4.712  0.375  14.90  PASS
  ST-3.1  ST-3.0  5 ST-3.1  0.43  0.85  0.36  1.15  10.47  9.30  10.70  18  35  1.30%  1.58  6.8  0.09  1.50  1.767  4.712  0.375  12.01  PASS
  #N/A  #N/A  #N/A  #N/A  10.55  9.26  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  Contributing Area =  1.15  Ac
  Next Tc =  10.55  Min.

  Storm Sewer Sizing Calculations, Run 02
  Area  Time of  Pipe  Pipe  Pipe  Partially  Velocity  Time of  Pipe  Pipe  Wetted Hydraulic  Qmax
  From  To  Area  Coefficient  Equivalent  Accum.  Intensity  Q = CIA
  Number  Concentration  Dia.  Length  Slope  Full Pipe  at Reqd.  Flow  Dia.  Area  Perimeter Radius  (Full Pipe)
  ST  ST  (see map)  (Ac)  of Runoff  Area (Ac)  Area (Ac)  (min)  (in/hr)  (cfs)  (in.)  (ft)  (%)  Area (sf)  (fps)  (min)  (ft)  (sf)  (ft)  (ft)  (cfs)
  ST-2.2  ST-2.1  7 ST-2.2  0.17  0.85  0.14  0.14  5.00  13.19  1.87  12  50  2.00%  0.29  6.4  0.13  1.00  0.785  3.142  0.250  5.05  PASS
  ST-2.1  CHAM  6 ST-2.1  0.38  0.87  0.33  0.47  5.13  13.05  6.11  18  30  1.83%  0.76  8.1  0.06  1.50  1.767  4.712  0.375  14.25  PASS
  #N/A  #N/A  #N/A  #N/A  5.19  12.98  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  Contributing Area =  0.47  Ac
  Next Tc =  5.19  Min.

  Storm Sewer Sizing Calculations, Run 03
  Area  Time of  Pipe  Pipe  Pipe  Partially  Velocity  Time of  Pipe  Pipe  Wetted Hydraulic  Qmax
  From  To  Area  Coefficient  Equivalent  Accum.  Intensity  Q = CIA
  Number  Concentration  Dia.  Length  Slope  Full Pipe  at Reqd.  Flow  Dia.  Area  Perimeter Radius  (Full Pipe)
  ST  ST  (see map)  (Ac)  of Runoff  Area (Ac)  Area (Ac)  (min)  (in/hr)  (cfs)  (in.)  (ft)  (%)  Area (sf)  (fps)  (min)  (ft)  (sf)  (ft)  (ft)  (cfs)
  BLDG  CHAM  4.1 CHAM  0.17  0.90  0.15  0.15  5.00  13.19  1.96  10  206  1.25%  0.43  4.5  0.76  0.83  0.545  2.618  0.208  2.46  PASS
  #N/A  #N/A  #N/A  #N/A  5.76  12.41  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  Contributing Area =  0.15  Ac
  Next Tc =  5.76  Min.

  Page 699 of 1493