Text · page 90 of 1493
Read the whole document on one page (all 1493 pages, each with its own heading)
APPENDICES Appendix A: Figures • A-1: Site Location Map • A-2: Soils Map • A-3: Historic Places Screening Map • A-4: Environmental Resource Map • A-5: FEMA Firm Map • A-6: Pre-Development Watershed Delineation Map (Pocket) • A-7: Post-Development Watershed Delineation Map (Pocket) Appendix B: Forms • Notice of Intent (NOI) • MS4 SWPPP Acceptance Form • SWPPP Preparer Certification Form • Owner/Operator Certification Form • Contractor and Subcontractor Certification Forms • Notice of Termination (NOT) Appendix C: Project Evaluation and Design Calculations Appendix D: Pre-Development Stormwater Modeling Appendix E: Post-Development Stormwater Modeling Appendix F: SWPPP Inspection Report (Sample Form) Appendix G: Post-Construction Inspections and Maintenance Appendix H: NYSDEC “Deep-Ripping and Decompaction,” April 2008 Appendix I: LaBella Certifying Professionals Letter Appendix J: NYSDEC SPDES General Permit GP-0-25-001 Page 90 of 1493