Southtowns Record

PBA07.09.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jul 9, 2026, 6:00 p.m.
Posted by publisher
Jul 9, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 92 of 1493

Read the whole document on one page (all 1493 pages, each with its own heading)

Runoff from the project site will discharge to the Cayuga Creek, which is not included in the list of
 Section 303(d) water bodies included in Appendix D of GP-0-25-001.

 Project construction activities will consist primarily of site grading, paving, building construction, and
 the installation of storm drainage, water supply, sanitary sewer, and public utility infrastructure
 necessary to support the proposed redevelopment project with an increase in impervious area.
 Construction phase pollutant sources anticipated at the site are disturbed (exposed) soil, vehicle fuels
 and lubricants, chemicals associated with building construction, and building materials. Without
 adequate control there is the potential for each type of pollutant to be transported by stormwater.

 1.2 Stormwater Pollution Controls

 The stormwater pollution controls outlined herein have been designed and evaluated in accordance
 with the following standards and guidelines:
  •  New York State Stormwater Management Design Manual, dated July 31, 2024 (Design
  Manual).
  •  New York State Standards and Specifications for Erosion and Sediment Control, dated
  November 2016 (SSESC).
  •  Town of West Seneca Town Code (2025-09-08) - Chapter 102A Stormwater Management and
  Erosion and Sediment Control

 Stormwater quality will be enhanced through the implementation of temporary and permanent erosion
 and sediment control measures, the proposed stormwater management practice(s), and other
 construction-phase pollution controls outlined herein.

 The proposed stormwater management approach consisting of pipes, open drainage ways, and on-
 site stormwater management practices will adequately collect, treat, and convey the stormwater
 runoff.

 Bioretentions and a water quality unit will be used to manage and treat stormwater runoff generated
 by the proposed redevelopment project with an increase in impervious area.

 Pre- and post-development surface runoff rates have been evaluated for the 1-, 10-, and 100-year 24-
 hour storm events. Comparison of pre- and post-development watershed conditions demonstrates that
 the peak rate of runoff from the project site will not be increased.

 The pollutant loading analysis indicates stormwater quality will be enhanced through the
 implementation of the proposed stormwater management practices outlined herein.

 The post-construction stormwater management practice(s) will be privately owned by Home Leasing.
 Deed restrictions will be in place, which require operation and maintenance of the practice(s) in
 accordance with the operation and maintenance plan.

Stormwater Pollution Prevention Plan
  Page 2
2241067
  Page 92 of 1493