June 10, 2026

Chapter 108-3

  The Standard Schedule of Fees shall be as follows:

  Any work started for which a permit is  $150 per month for each month in delinquency
  required but has not been issued  for a fence permit; $500 per month for each
  month in delinquency for all other permits

  Failed Inspection Fee  $75.00

  A.  Residential permits.

  Type  Fee
  Detached 1- and 2-family dwellings  $100 plus $0.50 per square foot of construction,
  including attached garages, porches and decks

  Dwelling addition permit  $100 minimum/$0.50 per square foot of
  construction
  Accessory buildings such as garages, barns and  $0.25 per square foot of construction
  sheds
  Accessory structures such as decks, porches,  $75
  small-scale solar (25 KW or less), etc.
  Alterations and repairs  $10 per $1,000 of project cost / $75 minimum
  Electric  $50.00

  Type  Fee
  Change of Use  $50.00
  Demolition  $0.10 per square foot
  Fence  $50
  Fireplace/Stove permit  $50 (included with new dwelling building
  permit); certificate of compliance required
  Swimming pool permit  $75 aboveground; $200 in-ground (includes
  fence permit)
  Pond permit  $250 (includes site plan review)
  Certificate of occupancy/compliance  $100 (no charge with a current building permit)
  Temporary certificate of occupancy  $100 (for six months maximum)
  Certificate of compliance  $100 (no charge with a current building permit)
  Mobile home parks  $10 per mobile home lot for initial license and
  annual renewal thereafter; $100 per each new
  mobile home or replacement
  Recreation fees
  Major subdivisions  $750 per new dwelling unit, payable upon final
  subdivision approval per the Subdivision Law
  Minor subdivisions  $750 per new dwelling unit, payable upon
  building permit approval
  Duplexes  $750 per new dwelling unit, payable upon
  approval of application

  3