Southtowns Record

Village Board minutes — May 4, 2026

Government
Village of Hamburg
Board
Village Board
Meeting
May 4, 2026
Kind
Minutes
Topics
Parks and recreation, Public safety, Zoning and land use, Budget and taxes, Roads and traffic, Water, sewer and drainage

Publisher's summary

Added by hand from the Village of Hamburg's minutes on eCode360.

Original document

Text · page 5 of 7

Read the whole document on one page (all 7 pages, each with its own heading)

MAY 4, 2026

Said application having been reviewed by the Architectural Review Committee (ARC) at their meeting
of April 21, 2026, and the Architectural Review Committee having made a recommendation to this Board
that said application be approved, and this Board having reviewed said application, the Board of Trustees
hereby APPROVES: the Application for Certificate of Compliance for building design standards for a
deck addition at 134 Buffalo Street, as recommended by the Architectural Review Committee.

AYES: Five
NAYS: None
CARRIED

11. MOTION by Trustee Davis, seconded by Trustee Hackathorn, to recommend the Village Board
approve the Application for Certificate of Compliance for building design standards for
additions/alterations at J.P. Fitzgerald’s, 4236 Clark Street. Changes include an accessible interior ramp
to be enclosed at the existing ramp entry point. In addition, an existing patio will also have a partial
enclosure – about half of the current space. A small smoking patio will be added, enclosed with Trex
fencing. The applicant is proposing to have a 2-story look when viewed from the exterior, adding fake
doors and windows to the 2-story dining room. Exterior finish materials consist of cultured stone, AZEK,
and composite board siding in tan with light brown trim. Accent window colors were also submitted;
timber framing at the entrances will be stained. The sloping roof will be black asphalt shingles on the
original building, with the existing additions will continue as flat roofs concealed by parapets. There are
no new roof heights. Said application having been reviewed by the Architectural Review Committee (ARC)
at their meeting of April 21, 2026, and the Architectural Review Committee having made a recommendation
to this Board that said application be approved, and this Board having reviewed said application, the Board
of Trustees hereby APPROVES: the Application for Certificate of Compliance for building design
standards for additions/alteration at J.P. Fitzerald’s, 4236 Clark Street, as recommended by the
Architectural Review Committee

AYES: Five
NAYS: None
CARRIED

12. MOTION by Trustee Davis, seconded by Trustee Hackathorn, to recommend the Village Board
approve the Application for Certificate of Compliance for building design standards for a roof at 125 Pine
Street/2 Brendel, as presented by homeowner Sarah Bishop. The applicant is proposing a new metal roof
to replace the existing asphalt shingle roof damaged by ice this past winter. The brown metal roof will
match the existing garage roof. Said application having been reviewed by the Architectural Review
Committee (ARC) at their meeting of April 21, 2026, and the Architectural Review Committee having
made a recommendation to this Board that said application be approved, and this Board having reviewed
said application, the Board of Trustees hereby APPROVES: the Application for Certificate of
Compliance for building design standards for a new metal roof at 125 Pine Street/2 Brendel, as
recommended by the Architectural Review Committee

AYES: Five
NAYS: None
CARRIED

13.  MOTION by Trustee Hackathorn, seconded by Trustee Davis, to authorize the payment of the
Village of Hamburg Accounts for the period ending May 4, 2026.

  GENERAL FUND…………………………………................................$223,862.93
  SEWER FUND…………………………………………………………….90,020.75

  115