EVSE Contract Agreement Effective Date: 7/27/2026 This Contract Agreement (“Agreement”) is between Pure Performance Renewable Energy Solutions Inc. (PPR Energy Solutions) and having its principal place of business at 430 Lawrence Bell Dr Suite 12 Buffalo, NY 14221 and Town of West Seneca and having its principal place of business at 1250 Union Rd. West Seneca NY 14224. WHEREAS, PPR Energy Solutions, Inc., herein after referred to as “Contractor”, is engaged in the business of installing Electric Vehicle Supply Equipment (EVSE) and Town of West Seneca after referred to as “Project Owner”, desires to obtain such services; the parties agree to the following terms and conditions: 1. Scope of Services Contractor to supply the necessary labor, materials and equipment required to perform the Electric Vehicle Supply Equipment (EVSE) installation and electrical contracting services described in detail in Schedule 1 and referenced in Exhibit B (site plan) of this Agreement on the property located at: West Seneca Soccer Complex – 3747 Seneca St. West Seneca N Y 14224 2. Project Costs and Incentives The detailed pricing and payment schedule of the projected costs for the required services is provided in Schedule 1 of this Agreement. The Project Owner is responsible for paying PPR Energy Solutions the balance of the project cost as described in Scheduled 1. The Project owner agrees that the EV Make Ready incentive, attached hereto as Exhibit A, is to be paid directly to PPR Energy Solutions by the Utility Company identified therein. 3. Schedule The schedule for providing the agreed upon services is included in Schedule 1 of this Agreement. Absent significant issues, all work shall be significantly completed by the date set forth in the schedule. Nevertheless, it is recognized that the schedule may change due to factors beyond the reasonable control of the Contractor such as modifications to the scope of services, as directed by the Project Owner, availability of materials provided that all required steps are taken to ensure that orders are timely processed, adverse weather conditions, latent site conditions not reasonably discoverable and permitting issues. 4. Subsequent Changes Any changes following the signing of this Agreement, whether to the scope of services, project costs, or schedule (other than beyond the control of the parties) will be made by a written Change Order which must be pre-approved in writing by the Project Owner. Unless parties agree otherwise, Subcontractor shall be paid for authorized extra work on the basis of the actual cost of materials and labor, plus an amount based upon the additional labor costs for overhead and profit not to exceed 10%. 5. Permits, Licensing and Approvals The Contractor is responsible for procuring any permits, inspections or approvals required for the completion of the projects listed in the scope of work. This includes any zoning changes or changes to applicable covenants or local building guidelines. Project Owner shall cooperate with all reasonable requests, including execution of documents, to assist in the procurement of permits and other necessary approvals. 6. Insurance and Loss Coverage Contractors shall maintain appropriate insurance coverage throughout the term of this Agreement in an amount set by the Town at $1,000,000.00 This shall include general liability covering bodily injury, property damage, and automobile liability covering all Contractor’s vehicles, equipment and operators in addition to statutory Worker compensation limits. The Project Owner agrees to maintain adequate property insurance to protect against loss or damage due to theft, fire, vandalism, weather, etc. Both parties agree to provide proof of insurance for their respective policies upon request. The Town shall be named as an additional insured on all Contractor’s policies and provided notice of any change to the policies within ten (10) calendar days of any change. Page 1 of 8 Page 40 of 190