Text · page 40 of 101
Read the whole document on one page (all 101 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
FIXED FEE Spreadsheet Azar Design Estimate # 16 PIN # 5765.46.121 Overhead 138% Approved OH Orig Agree Total Fixed Fee 15,893.99 15,893.99 Total Est Cost 269,075.15 269,075.15 Subconsultant 0.00 0.00 Estimate # 16 Direct Tech Labor (reg) 1,727.65 Direct Tech Labor (OT) 0.00 DNSC 0.00 Overhead 2,384.16 4,111.81 Fixed Fee | 452.30| Subconsultant 0.00 TOTAL 4,564.11 Fixed Fee = [(Direct Tech Labor + Overhead) x 11% ) DNSC = Direct Non-Salary Costs excluding subconsultants but including subcontract