Text · page 41 of 101
Read the whole document on one page (all 101 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
FIN423LL (05/12) FEDERAL-AID PROJECT CONSULTANT'S PAYROLL ABSTRACT NYSDOT CONTRACT NO. ESTIMATE NO. 16 CONSULTANT NAME Azar Design Co. 16-1210859 PIN (must be 9 digits) 5765.46.121 FOR PERIOD 08/01/26-08/28/26 NOTE: Use continuation sheet and carry total forward when items are too numerous to record below: ITEM IA DIRECT ITEM IB TITLE AS SHOWN IN HOURLY ~ |TECHNICAL |OVERTIME EMPLOYEE'S NAME CONTRACT RATE HOURS = |SALARY PREMIUM Boatwright, Otis Senior CADD Designer II $48.10 $0.00 Cox, Michael Project Manager VII $71.02 $0.00 Oakley-Craven, Elizabeth Engineer III $43.30 $0.00 O'Heron, William CADD Desinger II/I $44.98 $0.00 Pytik, Jacob Junior Engineer II/I $32.00 1.00 $32.00 Sentz, Gerard Senior Project Manager [X $113.56 4.00 $454.24 Sinatra, Harrison Engineer III $43.16 20.50 $884.78 Emborski, Gerard Senior Survey Technician III $46.25 $0.00 Garfinkel, Roy Survey Manager VI $69.00 $0.00 McAfee, Lucilia Senior Survey Technician III $45.75 $0.00 Shepherd, Steven Survey Technician I $35.00 $0.00 Smith, Jeremy Project Manager III $51.00 $0.00 Carling, Karen Sr, Environmental Scientist [V $60.00 0.50 $30.00 Dixon, Eric Environmental Scientist II/I $30.90 $0.00 Knoell, Kurt Senior Evnironmetal Scientist III $45.00 $0.00 Moy, Yeuk Envionmental Scientist III $41.20 $0.00 Perry, Tara Environmental Scientist II/I $36.31 $0.00 Stringer, Katy Environmental Scientist II/I $33.50 9.75 $326.63 Faduski, Max Engineer IV $53.00 $0.00 Pericak, Deanne Project Manager VIII $93.50 $0.00 Yang, Gregory Engineer IV $51.50 $0.00 TOTAL FROM CONTINUATION SHEETS TOTAL 35.75 $1,727.65 $0.00