Text · page 7 of 101
Read the whole document on one page (all 101 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
NOW, THEREFORE, in consideration of the mutual covenants contained herein, and of the mutual benefits to the residents of the Town and the Village, the Parties agree as follows: 1. VILLAGE CONSENT TO PROJECT 2.1 The Village hereby consents to the Town’s performance of the Project within the Court Premises and, to the extent shown on the Plans, within the common areas of the Building, substantially in accordance with the Plans. The Village acknowledges that it has received and reviewed the Plans. 2.2 Any change order or modification to the Plans that (a) affects the structure of the Building, the roof, or the Building’s base mechanical, electrical, plumbing, fire alarm or life-safety systems serving areas outside the Court Premises; (b) affects any area of the Building occupied by the Village or its Police Department; or (c) materially changes the scope of the Project, shall require the prior written approval of the Village, which approval shall not be unreasonably withheld, conditioned or delayed. The Village shall respond to any request for approval within ten (10) business days after receipt; [failure to respond within such period shall be deemed approval]. Change orders not described in this Section 2.2 may be approved by the Town without Village approval, provided the Town gives the Village a copy thereof. | 2,3 The Village designates its Mayor (the “Village Representative °), and the Town designates its Parties in day-to- ~day matters under this Agreement. 3. PROJECT COSTS. 3.1 The Town shall bear one hundred percent (100%) of all costs and expenses of the Project, including, without limitation, architectural and engineering fees; surveys and testing (including the asbestos and hazardous materials survey described in Section 5); abatement and disposal of hazardous materials required to be disturbed by Project work in the Project area; permits and fees; the construction contract price and all change orders; bonds and insurance required of the Town’s contractors; temporary protection; and the cost of repairing any damage to the Building to the extent caused by the Project (collectively, “Project Costs”). Project Costs shall not include the cost of correcting any Pre-Existing Condition (as defined in Section 3.4). 3.2 The Village shall have no obligation to pay, contribute to, appropriate funds for, or reimburse the Town for any Project Costs, and the Town shall not charge or offset any Project Costs against any amount due to the Village under the 2019 Agreement or any other agreement between the Parties. Nothing in this Agreement shall be construed to alter the allocation of costs for any Police Department renovation under Paragraph 6(a) or 6(b) of Lease Agreement (B), which is not part of the Project. 3.3 The Town represents that it has appropriated or will, prior to award of the construction contract, appropriate funds sufficient to pay the Project Costs. 3.4 If, during the Project, the Town or its contractors discover any defect, deficiency or code violation in the structure, roof, foundation, or base building electrical, plumbing, HVAC, fire alarm or life-safety systems of the Building that existed prior to commencement of the Project and was not caused by the Project (a “Pre-Existing Condition”), the Town shall promptly notify the Village. The Village shall, at its sole cost and consistent with its obligations under Paragraphs 3 and 4 of 2 11034126v2