Text · page 8 of 101
Read the whole document on one page (all 101 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Lease Agreement (B), correct such Pre-Existing Condition, or authorize the Town’s contractor to correct it at the Village’s cost, in either case within a time frame that does not delay the Project. Any delay or added cost to the Project resulting from the Village’s failure to timely address a Pre- Existing Condition shall be borne by the Village. 4. PROCUREMENT AND PERFORMANCE OF THE WORK 4.1 The Town shall act as “Owner” under the construction contract and all other contracts for the Project and shall be solely responsible for the procurement, award, administration and payment of such contracts. The Village shall not be a party to any such contract and shall have no liability thereunder. : 4.2 The Town shall cause the Project to be procured and performed in compliance with all applicable laws, including, without limitation, Section 103 of the General Municipal Law. The Town shall cause its contractors to obtain all required building permits and approvals from the authority having jurisdiction. 4.3 The Town shall require its general contractor to furnish a performance bond and a payment bond, each in a penal sum of one hundred percent (100%) of the contract price, issued by a surety authorized to do business in the State of New York. | 4.4 The Town shall use good faith efforts to cause the Project to achieve substantial completion within the contract time established in the construction contract, and shall keep the Village Representative reasonably informed of the Project schedule. The Town shall have no liability to the Village for delays in the Project caused by its contractors, unforeseen conditions, or other causes beyond the Town’s reasonable control. 5. HAZARDOUS MATERIALS 5.1 Prior to commencement of any demolition or construction work, the Town shall, at its sole cost, cause an asbestos survey of all areas to be disturbed by the Project to be performed by a firm and personnel holding the licenses and certifications required by Article 30 of the Labor Law and 12 NYCRR Part 56 (industrial Code Rule 56), and shall provide a copy of the survey report to the Village. 5.2 If asbestos-containing materials or other hazardous materials are identified in the Project area, the Town shall, at its sole cost, cause such materials to be abated, handled and disposed of by duly licensed contractors in compliance with all applicable federal, state and local laws, including air monitoring and clearance testing where required. The Town shall coordinate any abatement work with the Village so as to protect the occupants of the Building. 5.3 Nothing in this Agreement shall make the Town responsible for hazardous materials located outside the areas disturbed by the Project, or for conditions that are not disturbed or exacerbated by the Project, all of which shall remain the responsibility of the Village as owner of the Building. Ifhazardous materials outside the Court Premises must be abated to perform the Project, the Parties shall confirm in writing the allocation of such cost prior to the abatement work. 6. ACCESS, COORDINATION AND OCCUPIED BUILDING 6.1 The Village grants to the Town, the Architect, and the Town’s contractors and their subcontractors a license to enter the Building and the surrounding parking lot for the purposes of 3 11034126v2