80 OF 148  CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning

  Solar Energy System. The components and  B. Solar Energy Systems constructed or installed
  subsystems required to convert solar energy into  prior to the effective date of this Local Law shall
  electric energy suitable for use. The term includes,  not be required to meet the requirements of this
  but is not limited to, Solar Panels and Solar Energy  Local Law.
  Equipment. A Solar Energy System is classified as a  C. Modifications to an existing Solar Energy System
  Tier 1, Tier 2, Tier 3, or Tier 4 Solar Energy System as  that increase the Facility Area by more than 5 %
  follows.  of the original Facility Area (exclusive of moving
  A. Tier 1 Solar Energy Systems include the following:  any fencing) shall be subject to this Local Law.

  1.  Roof-Mounted Solar Energy Systems.  §8-15-5 General Requirements
  2.  Building-Integrated Solar Energy Systems.  A. A Building permit shall be required for installation
  3.  Ground-Mounted Solar Energy Systems with  of all Solar Energy Systems.
  a total solar panel surface area of up to 4,000  B. Prior to the issuance of the building permit or
  square feet.  final approval by the Code Enforcement Officer,
  B. Tier 2 Solar Energy Systems include the following:  construction and/or site plan documents must
  be signed and stamped by a NYS Licensed
  1.  Ground-Mounted Solar Energy Systems not
  Professional Engineer or NYS Registered
  included under Tier 1 Solar Energy Systems
  Architect.
  with a Facility Area of up to 8 acres in size
  and which generate up to 110 % of the  C. Local land use boards are encouraged
  electricity consumed on the site over the  to condition their approval of proposed
  previous 12 months.  developments on sites adjacent to Solar Energy
  Systems so as to protect their access to sufficient
  C. Tier 3 Solar Energy Systems include the
  sunlight to remain economically feasible over
  following:
  time.
  1.  Ground-Mounted Solar Energy Systems not  D. Issuance of permits and approvals by the City
  included under Tier 1 or Tier 2 Solar Energy  of Lackawanna Planning and Development
  Systems with a Facility Area of up to 40 acres  Board shall include review pursuant to the State
  in size.  Environmental Quality Review Act [ECL Article 8
  D. Tier 4 Solar Energy Systems are Solar Energy  and its implementing regulations at 6 NYCRR Part
  Systems which are not included under Tier 1, Tier  617 (“SEQRA”)].
  2, or Tier 3 Solar Energy Systems.  E. All Solar Energy Systems shall be designed,
  E. Solar Panel: A photovoltaic device capable of  erected, and installed in accordance with all
  collecting and converting solar energy into  applicable codes, regulations, and industry
  electricity.  standards as referenced in the NYS Uniform Fire
  Prevention and Building Code (“Uniform Code”),
  §8-15-4 Applicability  the NYS Energy Conservation Code (“Energy
  A. The requirements of this Local Law shall apply  Code”), and the City of Lackawanna Code.
  to all Solar Energy Systems permitted, installed,  F.  For Solar Energy Systems subject to site plan
  or modified in the City of Lackawanna after the  review, the City of Lackawanna shall impose, and
  effective date of this Local Law, excluding general  may update as appropriate, a schedule of fees to
  maintenance and repair.  recover expenses associated with engineering,
  environmental, or legal services determined to
  be reasonably necessary in the processing of an
  application under this law.