Text · page 110 of 219
Read the whole document on one page (all 219 pages, each with its own heading)
PART 8 General Development Standards 87 OF 148 D. Ownership Changes. If the owner or operator of 2. At the pre-application meeting, the Applicant the Solar Energy System changes or the owner must provide: of the property changes, the special use permit a. a brief description of the proposed facility shall remain in effect, provided that the successor and its environmental setting; owner or operator assumes in writing all of the b. a map of the proposed facility showing obligations of the decommissioning plan. A new project components; owner or operator of the Solar Energy System shall notify the zoning enforcement officer of c. the proposed facility’s anticipated such change in ownership or operator within 30 impacts; days of the ownership change. d. a designated contact person with telephone number, email address, and §8-15-9 Permitting Requirements mailing address from whom information for Tier 4 Solar Energy will be available going-forward basis; and, Systems e. an anticipated application submission All Tier 4 Solar Energy Systems are permitted through date. the issuance of a Special Use Permit within BRA-HI C. Special Use Permit Standards zoning district, and are subject to the site plan and special use permit application requirements 1. Setbacks: Tier 4 Solar Energy Systems shall established for Tier 3 Solar Energy Systems in Section have a setback of 100 feet from all property 8-15-8, in addition to (or in some cases amended by) boundaries. Fencing, collection lines, access the following requirements: roads and landscaping may occur within the setback. A. Applications for Tier 4 Solar Energy Systems shall: §8-15-10 Safety 1. Be reviewed by the Zoning Enforcement A. Solar Energy Systems and Solar Energy Officer for completeness. Applicants shall be Equipment shall be certified under the applicable advised within 60 days of the completeness electrical and/or building codes as required. of their application or any deficiencies that B. Solar Energy Systems shall be maintained must be addressed prior to substantive in good working order and in accordance review. with industry standards. Site access shall be B. Pre-Application Meeting. maintained, including snow removal at a level acceptable to the local fire department and, if 1. At least 60 days prior to the submission of the Tier 3 Solar Energy System is located in an an application, the Applicant shall conduct ambulance district, the local ambulance corps. a pre-application meeting with the City staff to ensure all parties have clear expectations C. If a Battery Energy Storage System is included as regarding any City requirements applicable part of the Solar Energy System, they shall meet to the proposed Solar Energy System. A the requirements of any applicable fire prevention written request for this purpose shall be and building code when in use and, when no sent to the Chairperson of the City Council. longer used, shall be disposed of in accordance Submission and review of the application with the laws and regulations of the City of shall not be delayed based on the failure Lackawanna and any applicable federal, state, or of the Chairperson to respond in a timely county laws or regulations. manner to a properly filed meeting request.