PART 8 General Development Standards  87 OF 148

D. Ownership Changes. If the owner or operator of  2.  At the pre-application meeting, the Applicant
  the Solar Energy System changes or the owner  must provide:
  of the property changes, the special use permit  a. a brief description of the proposed facility
  shall remain in effect, provided that the successor  and its environmental setting;
  owner or operator assumes in writing all of the
  b. a map of the proposed facility showing
  obligations of the decommissioning plan. A new
  project components;
  owner or operator of the Solar Energy System
  shall notify the zoning enforcement officer of  c. the proposed facility’s anticipated
  such change in ownership or operator within 30  impacts;
  days of the ownership change.  d. a designated contact person with
  telephone number, email address, and
§8-15-9 Permitting Requirements  mailing address from whom information
  for Tier 4 Solar Energy  will be available going-forward basis; and,
  Systems  e. an anticipated application submission
All Tier 4 Solar Energy Systems are permitted through  date.
the issuance of a Special Use Permit within BRA-HI
  C. Special Use Permit Standards
zoning district, and are subject to the site plan
and special use permit application requirements  1.  Setbacks: Tier 4 Solar Energy Systems shall
established for Tier 3 Solar Energy Systems in Section  have a setback of 100 feet from all property
8-15-8, in addition to (or in some cases amended by)  boundaries. Fencing, collection lines, access
the following requirements:  roads and landscaping may occur within the
  setback.
A. Applications for Tier 4 Solar Energy Systems
  shall:  §8-15-10 Safety
  1.  Be reviewed by the Zoning Enforcement  A. Solar Energy Systems and Solar Energy
  Officer for completeness. Applicants shall be  Equipment shall be certified under the applicable
  advised within 60 days of the completeness  electrical and/or building codes as required.
  of their application or any deficiencies that  B. Solar Energy Systems shall be maintained
  must be addressed prior to substantive  in good working order and in accordance
  review.  with industry standards. Site access shall be
B. Pre-Application Meeting.  maintained, including snow removal at a level
  acceptable to the local fire department and, if
  1.  At least 60 days prior to the submission of
  the Tier 3 Solar Energy System is located in an
  an application, the Applicant shall conduct
  ambulance district, the local ambulance corps.
  a pre-application meeting with the City staff
  to ensure all parties have clear expectations  C. If a Battery Energy Storage System is included as
  regarding any City requirements applicable  part of the Solar Energy System, they shall meet
  to the proposed Solar Energy System. A  the requirements of any applicable fire prevention
  written request for this purpose shall be  and building code when in use and, when no
  sent to the Chairperson of the City Council.  longer used, shall be disposed of in accordance
  Submission and review of the application  with the laws and regulations of the City of
  shall not be delayed based on the failure  Lackawanna and any applicable federal, state, or
  of the Chairperson to respond in a timely  county laws or regulations.
  manner to a properly filed meeting request.