Text · page 138 of 219
Read the whole document on one page (all 219 pages, each with its own heading)
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 115 OF 148 Manufactured Home Park Or Subdivision. A parcel Regulatory Floodway. The channel of a river or other (or contiguous parcels) of land divided into two or watercourse and the adjacent land areas that must be more manufactured home lots for rent or sale. reserved in order to discharge the base flood without cumulatively increasing the water surface elevation Mean Sea Level. For purposes of the National Flood more than a designated height as determined by the Insurance Program, the National Geodetic Vertical Federal Emergency Management Agency in a Flood Datum (NGVD) of 1929, the North American Vertical Insurance Study or by other agencies as provided in Datum of 1988 (NAVD 88), or other datum to which Subsection D(4)(b) of this section. base flood elevations shown on a community's FIRM are referenced. Sand Dunes. Naturally occurring accumulations of sand in ridges or mounds landward of the beach. Mobile Home. Has the same meaning as "manufactured home." Start of Construction. The date of permit issuance for new construction and substantial improvements New Construction. Structures for which the start to existing structures, provided that actual start of of construction commenced on or after the effective construction, repair, reconstruction, rehabilitation, date of a floodplain management regulation adopted addition placement, or other improvement is within by the community and includes any subsequent 180 days after the date of issuance. The actual start of improvements to such structure. construction means the first placement of permanent Primary Frontal Dune. A continuous or nearly construction of a building (including a manufactured continuous mound or ridge of sand with relatively home) on a site, such as the pouring of a slab or steep seaward and landward slopes immediately footings, installation of pilings or construction of landward and adjacent to the beach and subject to columns. Permanent construction does not include erosion and overtopping from high tides and waves land preparation (such as clearing, excavation, during major coastal storms. The inland limit of the grading, or filling), or the installation of streets or primary frontal dune occurs at the point where there walkways, or excavation for a basement, footings, is a distinct change from a relatively steep slope to a piers or foundations, or the erection of temporary relatively mild slope. forms, or the installation of accessory buildings such as garages or sheds not occupied as dwelling units Principally Aboveground. At least 51% of the actual or not part of the main building. For a substantial cash value of the structure, excluding land value, is improvement, the actual "start of construction" aboveground. means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not Recreational Vehicle. A vehicle which is: that alteration affects the external dimensions of the 1. Built on a single chassis; building. 2. Four hundred square feet or less when Structure. A walled and roofed building, including measured at the largest horizontal a gas or liquid storage tank, that is principally projections; aboveground, as well as a manufactured home. 3. Designed to be self-propelled or permanently Substantial Damage. Damage of any origin towable by a light-duty truck; and sustained by a structure whereby the cost of restoring 4. Not designed primarily for use as a the structure to its before-damaged condition would permanent dwelling but as temporary living equal or exceed 50% of the market value of the quarters for recreational, camping, travel, or structure before the damage occurred. seasonal use.