Text · page 163 of 219
Read the whole document on one page (all 219 pages, each with its own heading)
140 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning 9. Existing roadways, driveways, sidewalks and 20. Landscape plan indicating location, type pedestrian paths immediately adjoining and and size of existing trees and vegetation and opposite from the proposed site, including those to be preserved or removed as well as names. location, type and size of trees, vegetation, 10. Location and dimensions of all parking, amenities to be provided, tree staking, plant loading and stacking areas. installation, soil preparation details and all other applicable installation details and 11. Paving, including typical cross sections and calculation of the total landscaped area. profiles of proposed streets, crosswalks, pedestrian walkways and bikeways. 21. Location and proposed development of all buffer areas, including existing vegetative 12. Location, proposed use, height, building cover. elevations, floor plans and finished elevations of all structures. 22. Location, design and illumination field of all pools, ponds, water features, lighting fixtures, 13. Colors, materials, dimensions, access and fences and walls. roof top plans of all structures. 23. Location, dimension, design and construction 14. Location and proposed development type of all signs. of all open spaces, including parks and playgrounds. 24. Required screening and enclosures. 15. Existing and proposed watercourses 25. Location of public transit stops and shelters. 16. Drainage plan showing existing and finished 26. Proposed easements, restrictions, covenants grades, stormwater management plan, and provisions for homeowners' associations impact of the watershed and any slopes and common ownerships. greater than 5%. The best management 27. Location, design and construction of all practices employed to mitigate the impacts energy distribution facilities, including of stormwater management shall be set electrical, gas, solar and wind energy. forth in detail. A copy of the storm drainage 28. Identification of any state or county permits analysis shall be submitted for review when required for the project's execution and required by the City Engineer. documentation of application for and 17. Water supply plan, including existing and approval status of all necessary permits from proposed location of fire hydrants, fire lanes, state and county officials. size of service line and a note indicating 29. Additional supporting data or plans backflow preventor. deemed necessary and relevant to carry 18. A description of the method of securing out the Planning and Development Board's public water and location, design and responsibility for site plan review upon construction materials of such facilities. notification to the proposed developer 19. Sewage disposal method and location, and their decision to proceed with the design and construction materials of such application. facilities. 30. A stormwater pollution prevention plan (SWPPP), if required for the proposed development under Article XII of this chapter, together with the recommendation of the Stormwater Management Officer to approve, approve with modifications, or disapprove the SWPPP pursuant to § 230-93B of this chapter