Southtowns Record

Planning Board agenda packet — October 28, 2026

Government
City of Lackawanna
Board
Planning Board
Meeting
Oct 28, 2026
Kind
Agenda packet
Topics
Zoning and land use, Water, sewer and drainage, Energy and data center siting, Roads and traffic, Parks and recreation, Public safety, Budget and taxes, Short-term rentals, Housing

Original document

Same meeting

Text · page 75 of 219

Read the whole document on one page (all 219 pages, each with its own heading)

52 OF 148  CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning

  §7-3  EROSION AND
  SEDIMENTATION
  [Amended 2-5-2008]
  MINIMUM  MAXIMUM
  A. All land development activities subject to  SLOPE  SLOPE
  regulation under Article XII of this chapter  Planting areas  2%  12%
  shall comply with the performance and design
  criteria and other requirements set forth therein,  Parking lot pavement  2%  4%
  including the preparation of a stormwater
  Driveways, access drives  2%  6%
  pollution prevention plan.
  B. For all construction activities that are not  Pedestrian pavements  1%  2%
  subject to regulation under Article XII of this
  Sidewalks  1%  5%
  chapter, and where a significant soil erosion or
  sediment deposition may occur as a result of the  Cut and fill slopes  12%
  disturbance of the land, the City Planning and
  Development Board may require an application
  for site plan review to be accompanied by an  §7-4  LANDSCAPING
  erosion and sediment control plan conforming
  to the standards and practices contained in the  §7-4-1  Purpose
  USDA Natural Resources Conservation Service
  A. It is the purpose of this chapter to promote better
  Engineering Field Services Manual (EFM) and
  site design, introduce shade and habitat, prevent
  the New York Standards and Specifications for
  the erosion of soils, provide water absorption
  Erosion and Sediment Control, or other erosion
  and retention to limit excess stormwater runoff,
  and sediment control manual recognized by
  enhance air quality, provide natural buffers to
  the Engineering Department or Planning and
  development, and enhance the aesthetic and
  Development Board.
  scenic beauty of the City of Lackawanna.
  C. Final grading shall coincide with the planting
  B. The standards set forth in this chapter are
  season to ensure quick soil stabilization;
  intended to:
  D. Construction phase topsoil stockpiles shall be
  1.  Dissuade the unnecessary clearing and
  graded and covered or seeded within one month
  disturbing of land and preserve the natural
  of deposition;
  growth of existing flora.
  E. Upon construction completion, temporary
  2.  Conserve and stabilize property values,
  berms, swales, settling ponds and other erosion
  preserve a healthy environment, and facilitate
  control mechanisms shall be reshaped and
  the creation of a convenient, attractive, and
  planted or otherwise maintained to conform with
  harmonious community environment.
  an approved site plan and to comply with any
  stormwater pollution prevention plan approved  3.  Provide shade.
  by the City for the project; and,  4.  Reduce the level of carbon dioxide and
  F.  All new developments must meet the following  airborne pollutants and return oxygen to the
  gradient standards:  atmosphere.
  5.  Provide unpaved areas for the absorption of
  surface waters.