Sewer Department Board Meeting Report November 2026 Treated 14.464 million gallons of sewage Received 164,900 gallons of septage Daily Operations Performed: e =©Twice daily sampling and visual inspections « Sludge pumping operations Ongoing Responsibilities: e Weekly permit compliance sampling e Scheduled maintenance tasks and repairs performed on process equipment « Grounds maintenance and upkeep e = Tank cleaning e Sewer maintenance and flushing e Monthly reports e Locating dig notices This month additionally we have: e Assisted water department with repairs to the water leak on Dawson Drive e Assisted in the joint effort with the splash pad installation at St Johns Park e UV system taken offline and winterized e Rebuilt boiler system circulating pump e Helped highway vac/flush storm sewer on E. Hill St. e Identified manholes for replacement when the 2027 DOT project takes place e Minor issues with UV system persist, working with Koester and Wendel Engineering for solutions e Undercoated pickup for rust protection e Replaced the broken leaf spring on the water department's Nissan Van e STC started the ferric tank installation project e Replaced a broken manhole cover at the intersection of Buffalo St and Union St e Fire extinguishers inspected e Replaced broken manhole frames and covers on Walnut St and Beech St e Worked with National Fuel in regards to a suspected gas line through a sewer main on Torrence Pl