Stormwater Management Report  July 2026
Proposed Development
West Seneca, NY

  EXECUTIVE SUMMARY

The proposed Costco Project includes the redevelopment of an existing parcel located
northeast of the intersection of Slade Avenue and Ridge Road in the City of West Seneca, Erie
County, New York. The Project consists of the construction of an approximately 187,050-square-
foot retail warehouse building and a 16-pump fuel facility providing 32 fueling positions.

The proposed development will also include associated parking facilities, utility infrastructure,
stormwater management facilities, and landscaping improvements. The Project is located within
the West Seneca Exchange master-planned development and will utilize the stormwater
quantity and quality controls proposed as part of the overall master development. The Project
parcel encompasses approximately 787,828 square feet (18.10 acres) of the 55.57-acre master
development area. The total limit of disturbance required to complete the Project is
approximately 19.14 acres, including off-site roadway improvements.

The Costco site improvements have been designed in coordination with Carmina Wood Design,
the Engineer of Record for the master development. Stormwater runoff from the Costco parcel
will be conveyed to and managed within a shared development stormwater basin. A
comprehensive stormwater analysis for the overall development is included in the Carmina
Wood Design Engineer's Report. BL Companies and Carmina Wood Design have coordinated
the stormwater conveyance design for the Costco Project to ensure compliance with all
applicable regulatory requirements and design standards.

Utility services for the Project will be provided through a combination of public and private utility
infrastructure. Water demand and sanitary sewer analyses are included in the Carmina Wood
Design Engineer's Report. BL Companies and Carmina Wood Design have worked
collaboratively to coordinate utility demands and verify that sufficient capacity is available to
serve the proposed development.

This report, in conjunction with the BL Companies design plans and supporting documentation
prepared by Carmina Wood Design, provides a detailed engineering summary of the proposed
site's functionality and demonstrates compliance with all applicable local and state regulations,
standards, and design requirements.

[Type here]  -1-  2401824