Text · page 1150 of 1174
Read the whole document on one page (all 1174 pages, each with its own heading)
Stormwater Management Report July 2026 Proposed Development West Seneca, NY 2.0 STORMWATER MANAGEMENT STANDARDS AND PERFORMANCE CRITERIA The proposed stormwater management system has been designed in general conformance with the current Town of West Seneca regulations and the New York State Stormwater Management Design Manual. The overall stormwater management system for the development has been analyzed by Carmina Wood Design, and the results are documented in the Engineer's Report. BL Companies provided drainage patterns, drainage area delineations, and impervious coverage data to support the stormwater modeling. The proposed site has been designed to maintain existing drainage patterns and avoid adverse impacts to adjacent properties. The New York State Department of Environmental Conservation (NYSDEC) Stormwater Management Design Manual identifies five primary stormwater management criteria that must be addressed during project design: Water Quality, Runoff Reduction Volume, Channel Protection, Overbank Flood Protection, and Extreme Flood Protection. Because the proposed stormwater system serves as a component of the larger master-planned stormwater management system, compliance with these design criteria is addressed within the Master Plan Stormwater Management Report. The proposed storm drainage system has been sized to convey the 25-year design storm to the respective discharge points without ponding or hydraulic surcharge above catch basin or manhole grate elevations. Rainfall intensities were developed using the applicable NOAA precipitation data. A minimum pipe diameter of 12 inches is proposed throughout the Costco project area. Runoff coefficients for each drainage area were calculated as weighted averages based on the proportion of impervious and pervious surfaces contributing runoff. Impervious surfaces, including asphalt pavement, concrete pavement, and building roof areas, were assigned a Rational Method runoff coefficient (C-value) of 0.90. Pervious surfaces, including landscaped and lawn areas, were assigned a runoff coefficient of 0.30. Tailwater elevations at stormwater management facilities and flared end sections were established based on the computed 25-year design storm water surface elevation within the receiving basin to which each outlet discharges. The proposed storm drainage system was modeled using StormCAD Version 8i (Bentley Systems, formerly Haestad Methods) utilizing the Rational Method. Supporting hydraulic calculations are provided in Appendix B. [Type here] -5- 2401824 Page 1150 of 1174