Stormwater Management Report  July 2026
Proposed Development
West Seneca, NY

2.0  STORMWATER MANAGEMENT STANDARDS AND PERFORMANCE CRITERIA
The proposed stormwater management system has been designed in general conformance
with the current Town of West Seneca regulations and the New York State Stormwater
Management Design Manual.

The overall stormwater management system for the development has been analyzed by
Carmina Wood Design, and the results are documented in the Engineer's Report. BL Companies
provided drainage patterns, drainage area delineations, and impervious coverage data to
support the stormwater modeling. The proposed site has been designed to maintain existing
drainage patterns and avoid adverse impacts to adjacent properties.

The New York State Department of Environmental Conservation (NYSDEC) Stormwater
Management Design Manual identifies five primary stormwater management criteria that must
be addressed during project design: Water Quality, Runoff Reduction Volume, Channel
Protection, Overbank Flood Protection, and Extreme Flood Protection. Because the proposed
stormwater system serves as a component of the larger master-planned stormwater
management system, compliance with these design criteria is addressed within the Master Plan
Stormwater Management Report.

The proposed storm drainage system has been sized to convey the 25-year design storm to the
respective discharge points without ponding or hydraulic surcharge above catch basin or
manhole grate elevations. Rainfall intensities were developed using the applicable NOAA
precipitation data. A minimum pipe diameter of 12 inches is proposed throughout the Costco
project area.

Runoff coefficients for each drainage area were calculated as weighted averages based on
the proportion of impervious and pervious surfaces contributing runoff. Impervious surfaces,
including asphalt pavement, concrete pavement, and building roof areas, were assigned a
Rational Method runoff coefficient (C-value) of 0.90. Pervious surfaces, including landscaped
and lawn areas, were assigned a runoff coefficient of 0.30.

Tailwater elevations at stormwater management facilities and flared end sections were
established based on the computed 25-year design storm water surface elevation within the
receiving basin to which each outlet discharges.

The proposed storm drainage system was modeled using StormCAD Version 8i (Bentley Systems,
formerly Haestad Methods) utilizing the Rational Method. Supporting hydraulic calculations are
provided in Appendix B.

[Type here]  -5-  2401824