Southtowns Record

PB Agenda Packet 8.13.2026

Government
Town of West Seneca
Board
Planning Board
Meeting
Aug 13, 2026, 6:00 p.m.
Posted by publisher
Jul 28, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Roads and traffic, Housing, Zoning and land use, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 166 of 1174

Read the whole document on one page (all 1174 pages, each with its own heading)

D_App D_Pre-Development Model  NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates  Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC  Page 15

  Summary for Subcatchment ES-2: E Site

Runoff  =  10.17 cfs @ 12.22 hrs, Volume=  0.895 af, Depth= 3.18"
  Routed to Reach AP-1 : Cayuga Creek

Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"

  Area (sf)  CN  Description
  7,764  98  Paved parking, HSG D
  139,294  80  >75% Grass cover, Good, HSG D
  147,058  81  Weighted Average
  139,294  94.72% Pervious Area
  7,764  5.28% Impervious Area

  Tc Length Slope Velocity Capacity Description
  (min) (feet)  (ft/ft) (ft/sec) (cfs)
  13.3  100 0.0150  0.13  Sheet Flow, SF
  Grass: Short n= 0.150 P2= 2.20"
  6.1  290 0.0130  0.80  Shallow Concentrated Flow, SCF
  Short Grass Pasture Kv= 7.0 fps
  19.4  390 Total

  Subcatchment ES-2: E Site
  Hydrograph

  Runoff
  11  10.17 cfs
  10  NY-West Seneca 24-hr S1 100-yr
  Rainfall=5.22"
  9
  Runoff Area=147,058 sf
  8  Runoff Volume=0.895 af
  7  Runoff Depth=3.18"
  Flow Length=390'
  Flow (cfs)

  6
  Tc=19.4 min
  5  CN=81
  4

  3

  2

  1

  0
  0  2 4  6  8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
  Time (hours)

  Page 166 of 1174