Southtowns Record

PB Agenda Packet 8.13.2026

Government
Town of West Seneca
Board
Planning Board
Meeting
Aug 13, 2026, 6:00 p.m.
Posted by publisher
Jul 28, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Roads and traffic, Housing, Zoning and land use, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 183 of 1174

Read the whole document on one page (all 1174 pages, each with its own heading)

E_App E_Post-Development Model  NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates  Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC  Page 11

  Summary for Subcatchment PS-6:

Runoff  =  0.37 cfs @ 12.04 hrs, Volume=  0.020 af, Depth= 1.60"
  Routed to Reach DP-1 : Design Point

Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"

  Area (sf)  CN  Description
  6,622  98  Paved parking, HSG D
  6,622  100.00% Impervious Area

  Tc Length  Slope Velocity Capacity Description
  (min) (feet)  (ft/ft) (ft/sec) (cfs)
  6.0  Direct Entry, Direct

  Subcatchment PS-6:
  Hydrograph

  Runoff
  0.4  0.37 cfs
  0.38
  0.36
  NY-West Seneca 24-hr S1 1-yr
  0.34  Rainfall=1.82"
  0.32
  Runoff Area=6,622 sf
  0.3
  0.28  Runoff Volume=0.020 af
  0.26  Runoff Depth=1.60"
  0.24
  Flow (cfs)

  0.22
  Tc=6.0 min
  0.2  CN=98
  0.18
  0.16
  0.14
  0.12
  0.1
  0.08
  0.06
  0.04
  0.02
  0
  0 2  4 6  8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
  Time (hours)

  Page 183 of 1174