Southtowns Record

PB Agenda Packet 8.13.2026

Government
Town of West Seneca
Board
Planning Board
Meeting
Aug 13, 2026, 6:00 p.m.
Posted by publisher
Jul 28, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Roads and traffic, Housing, Zoning and land use, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 540 of 1174

Read the whole document on one page (all 1174 pages, each with its own heading)

WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates  Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC  Page 73

  Summary for Subcatchment PS-9: OFF-SITE DRAINAGE

Runoff  =  8.05 cfs @ 12.80 hrs, Volume=  1.246 af, Depth= 2.99"
  Routed to Reach 9R : East Swale

Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"

  Area (sf)  CN  Description
  1,089  80  >75% Grass cover, Good, HSG D
  1,699  98  Paved parking, HSG D
  214,969  79  Woods, Fair, HSG D
  217,757  79  Weighted Average
  216,058  99.22% Pervious Area
  1,699  0.78% Impervious Area

  Tc Length Slope Velocity Capacity Description
  (min) (feet)  (ft/ft) (ft/sec) (cfs)
  20.0  600 0.0100  0.50  Shallow Concentrated Flow,
  Woodland Kv= 5.0 fps
  34.2  100 0.0100  0.05  Sheet Flow, 100'
  Woods: Light underbrush n= 0.400 P2= 2.20"
  5.2  157 0.0100  0.50  Shallow Concentrated Flow, Swale
  Woodland Kv= 5.0 fps
  59.4  857 Total

  Subcatchment PS-9: OFF-SITE DRAINAGE
  Hydrograph

  9
  Runoff
  8.05 cfs
  8  NY-West Seneca 24-hr S1 100-yr
  Rainfall=5.22"
  7
  Runoff Area=217,757 sf
  6
  Runoff Volume=1.246 af
  Runoff Depth=2.99"
  Flow Length=857'
  Flow (cfs)

  5
  Slope=0.0100 '/'
  4  Tc=59.4 min
  CN=79
  3

  2

  1

  0
  0  2 4  6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
  Time (hours)

  Page 540 of 1174