Text · page 64 of 1174
Read the whole document on one page (all 1174 pages, each with its own heading)
Runoff from the project site will discharge to the Cayuga Creek, which is not included in the list of Section 303(d) water bodies included in Appendix D of GP-0-25-001. Project construction activities will consist primarily of site grading, paving, building construction, and the installation of storm drainage, water supply, sanitary sewer, and public utility infrastructure necessary to support the proposed redevelopment project with an increase in impervious area. Construction phase pollutant sources anticipated at the site are disturbed (exposed) soil, vehicle fuels and lubricants, chemicals associated with building construction, and building materials. Without adequate control there is the potential for each type of pollutant to be transported by stormwater. 1.2 Stormwater Pollution Controls The stormwater pollution controls outlined herein have been designed and evaluated in accordance with the following standards and guidelines: • New York State Stormwater Management Design Manual, dated July 31, 2024 (Design Manual). • New York State Standards and Specifications for Erosion and Sediment Control, dated November 2016 (SSESC). • Town of West Seneca Town Code (2025-09-08) - Chapter 102A Stormwater Management and Erosion and Sediment Control Stormwater quality will be enhanced through the implementation of temporary and permanent erosion and sediment control measures, the proposed stormwater management practice(s), and other construction-phase pollution controls outlined herein. The proposed stormwater management approach consisting of pipes, open drainage ways, and on- site stormwater management practices will adequately collect, treat, and convey the stormwater runoff. Bioretentions and a water quality unit will be used to manage and treat stormwater runoff generated by the proposed redevelopment project with an increase in impervious area. Pre- and post-development surface runoff rates have been evaluated for the 1-, 10-, and 100-year 24- hour storm events. Comparison of pre- and post-development watershed conditions demonstrates that the peak rate of runoff from the project site will not be increased. The pollutant loading analysis indicates stormwater quality will be enhanced through the implementation of the proposed stormwater management practices outlined herein. The post-construction stormwater management practice(s) will be privately owned by Home Leasing. Deed restrictions will be in place, which require operation and maintenance of the practice(s) in accordance with the operation and maintenance plan. Stormwater Pollution Prevention Plan Page 2 2241067 Page 64 of 1174