Southtowns Record

PB Agenda Packet 8.13.2026

Government
Town of West Seneca
Board
Planning Board
Meeting
Aug 13, 2026, 6:00 p.m.
Posted by publisher
Jul 28, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Roads and traffic, Housing, Zoning and land use, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 651 of 1174

Read the whole document on one page (all 1174 pages, each with its own heading)

ENGINEERING.ARCHITECTURE.ENVIRONMENTAL.PLANNING  Job # 2241067
300 State Street, Suite 201 ● Rochester, NY 14614  Project: West Seneca Apartments
Phone 585.454.6110 ● Fax 585.454.3066  Date: 6/15/2026
www.labellapc.com  By: JB

Location: West Seneca, NY
Design Storm Event: 10-Year
Roughness Coefficient, N =  0.013

  Storm Sewer Sizing Calculations, Run 01
  Area  Time of  Pipe  Pipe  Pipe  Partially  Velocity  Time of  Pipe  Pipe  Wetted Hydraulic  Qmax
  From  To  Area  Coefficient  Equivalent  Accum.  Intensity  Q = CIA
  Number  Concentration  Dia.  Length  Slope  Full Pipe  at Reqd.  Flow  Dia.  Area  Perimeter Radius  (Full Pipe)
  ST  ST  (see map)  (Ac)  of Runoff  Area (Ac)  Area (Ac)  (min)  (in/hr)  (cfs)  (in.)  (ft)  (%)  Area (sf)  (fps)  (min)  (ft)  (sf)  (ft)  (ft)  (cfs)
  ST-3.4  ST-3.3  1 ST-3.4  0.21  0.84  0.17  0.31  6.00  12.19  3.77  18  150  0.90%  0.67  5.7  0.44  1.50  1.767  4.712  0.375  9.99  PASS
  ST-3.3  ST-3.2  2 ST-3.3  0.12  0.86  0.10  0.50  10.00  9.52  4.80  18  102  0.90%  0.85  5.7  0.30  1.50  1.767  4.712  0.375  9.99  PASS
  ST-3.2  ST-3.1  3 ST-3.2  0.38  0.74  0.28  0.79  10.30  9.37  7.38  18  85  2.00%  0.88  8.4  0.17  1.50  1.767  4.712  0.375  14.90  PASS
  ST-3.1  ST-3.0  5 ST-3.1  0.43  0.85  0.36  1.15  10.47  9.30  10.70  18  35  1.30%  1.58  6.8  0.09  1.50  1.767  4.712  0.375  12.01  PASS
  #N/A  #N/A  #N/A  #N/A  10.55  9.26  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  Contributing Area =  1.15  Ac
  Next Tc =  10.55  Min.

  Storm Sewer Sizing Calculations, Run 02
  Area  Time of  Pipe  Pipe  Pipe  Partially  Velocity  Time of  Pipe  Pipe  Wetted Hydraulic  Qmax
  From  To  Area  Coefficient  Equivalent  Accum.  Intensity  Q = CIA
  Number  Concentration  Dia.  Length  Slope  Full Pipe  at Reqd.  Flow  Dia.  Area  Perimeter Radius  (Full Pipe)
  ST  ST  (see map)  (Ac)  of Runoff  Area (Ac)  Area (Ac)  (min)  (in/hr)  (cfs)  (in.)  (ft)  (%)  Area (sf)  (fps)  (min)  (ft)  (sf)  (ft)  (ft)  (cfs)
  ST-2.2  ST-2.1  7 ST-2.2  0.17  0.85  0.14  0.14  5.00  13.19  1.87  12  50  2.00%  0.29  6.4  0.13  1.00  0.785  3.142  0.250  5.05  PASS
  ST-2.1  CHAM  6 ST-2.1  0.38  0.87  0.33  0.47  5.13  13.05  6.11  18  30  1.83%  0.76  8.1  0.06  1.50  1.767  4.712  0.375  14.25  PASS
  #N/A  #N/A  #N/A  #N/A  5.19  12.98  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  Contributing Area =  0.47  Ac
  Next Tc =  5.19  Min.

  Storm Sewer Sizing Calculations, Run 03
  Area  Time of  Pipe  Pipe  Pipe  Partially  Velocity  Time of  Pipe  Pipe  Wetted Hydraulic  Qmax
  From  To  Area  Coefficient  Equivalent  Accum.  Intensity  Q = CIA
  Number  Concentration  Dia.  Length  Slope  Full Pipe  at Reqd.  Flow  Dia.  Area  Perimeter Radius  (Full Pipe)
  ST  ST  (see map)  (Ac)  of Runoff  Area (Ac)  Area (Ac)  (min)  (in/hr)  (cfs)  (in.)  (ft)  (%)  Area (sf)  (fps)  (min)  (ft)  (sf)  (ft)  (ft)  (cfs)
  BLDG  CHAM  4.1 CHAM  0.17  0.90  0.15  0.15  5.00  13.19  1.96  10  206  1.25%  0.43  4.5  0.76  0.83  0.545  2.618  0.208  2.46  PASS
  #N/A  #N/A  #N/A  #N/A  5.76  12.41  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  #N/A  0.00  0.000  0.000  #DIV/0!  #DIV/0!  #DIV/0!
  Contributing Area =  0.15  Ac
  Next Tc =  5.76  Min.

  Page 651 of 1174