Southtowns Record

PB Agenda Packet 8.13.2026

Government
Town of West Seneca
Board
Planning Board
Meeting
Aug 13, 2026, 6:00 p.m.
Posted by publisher
Jul 28, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Roads and traffic, Housing, Zoning and land use, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 747 of 1174

Read the whole document on one page (all 1174 pages, each with its own heading)

24-4113 WEST SENECA EXCAHNGE NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Prepared by Carmina Wood Design  Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC  Page 12

  Summary for Subcatchment 12S: Slade Ave

[49] Hint: Tc<2dt may require smaller dt

Runoff  =  1.33 cfs @ 11.99 hrs, Volume=  0.062 af, Depth= 1.65"
  Routed to Pond 18P : POND

Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"

  Area (ac)  CN  Description
  0.450  98  Paved parking, HSG D
  0.450  100.00% Impervious Area

  Tc Length Slope Velocity Capacity Description
  (min) (feet)  (ft/ft) (ft/sec) (cfs)
  0.5  30 0.0200  0.96  Sheet Flow, pavement
  Smooth surfaces n= 0.011 P2= 2.50"
  0.4  60 0.0025  2.27 1.78 Pipe Channel, 12" pipe
  12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
  n= 0.013 Corrugated PE, smooth interior
  0.9  90 Total

  Subcatchment 12S: Slade Ave
  Hydrograph

  Runoff
  1.33 cfs
  NY-WestSeneca_NOAA14 24-hr S1 1-yr
  Rainfall=1.87"
  Runoff Area=0.450 ac
  Runoff Volume=0.062 af
  1  Runoff Depth=1.65"
  Flow Length=90'
  Tc=0.9 min
  Flow (cfs)

  CN=98

  0
  0  10  20  30  40  50  60  70  80  90  100  110  120  130  140  150
  Time (hours)

  Page 747 of 1174