Southtowns Record

PB Agenda Packet 8.13.2026

Government
Town of West Seneca
Board
Planning Board
Meeting
Aug 13, 2026, 6:00 p.m.
Posted by publisher
Jul 28, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Roads and traffic, Housing, Zoning and land use, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 797 of 1174

Read the whole document on one page (all 1174 pages, each with its own heading)

24-4113 WEST SENECA EXCAHNG NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Prepared by Carmina Wood Design  Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC  Page 62

  Summary for Link 12L: COSTCO

Inflow Area =  21.223 ac, 78.41% Impervious, Inflow Depth = 4.51" for 100-yr event
Inflow  =  154.57 cfs @ 12.03 hrs, Volume=  7.978 af
Primary  =  154.57 cfs @ 12.03 hrs, Volume=  7.978 af, Atten= 0%, Lag= 0.0 min
  Routed to Pond 18P : POND

Primary outflow = Inflow, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs

100-yr Primary Outflow Imported from COSTCO HYDROCAD 2026-04-13~Link 16L.hce

  Link 12L: COSTCO
  Hydrograph

  Inflow
  170
  154.57 cfs  Primary
  154.57 cfs  Inflow Area=21.223 ac
  160
  100-yr Primary Outflow
  150  Imported from
  140  COSTCO HYDROCAD 2026-04-13~Link 16L.hce
  Area= 924,495 sf
  130
  78.41% Imperv.
  120
  110
  100
  Flow (cfs)

  90
  80
  70
  60
  50
  40
  30
  20
  10
  0
  0  10  20  30  40  50  60  70  80  90  100  110  120  130  140  150
  Time (hours)

  Page 797 of 1174