Southtowns Record

PB Agenda Packet 8.13.2026

Government
Town of West Seneca
Board
Planning Board
Meeting
Aug 13, 2026, 6:00 p.m.
Posted by publisher
Jul 28, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Roads and traffic, Housing, Zoning and land use, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 819 of 1174

Read the whole document on one page (all 1174 pages, each with its own heading)

Stormwater Ponds
Design Point:  1
  Enter Site Data For Drainage Area to be Treated by Practice
  Contributing  Impervious  Percent
Drainage Area  WQv  Precipitation
  Area  Area  Impervious  Rv  Description
  Number  (cf)  (in)
  (Acres)  (Acres)  %

  1  53.00  11.20  21  0.24  46,210  1.00  0

Select pond type  Wet Pond
  Design Criteria
Is the pond located within jurisdictional waters?  No
Enter the natural slope of the pond area (%)  2
Enter underlying soil infiltration rate (based on
  0
geotechnical testing, refer to Appendix D).
Has an impermeable liner been provided?  No
Is the pond located within a sole source aquifer?  No
Is the pond located within a designated hotspot?  No
Enter depth to seasonal high water table (ft)  5
Enter depth to sound bedrock (ft)  5
List any drainage areas treated by other practices  Additional
  0
that will be directed to this practice.  Areas
Is the contributing area less than the minimum
  No
contributing area?
Will the pond discharge to trout waters?  No
Has a controlled outlet been provided?  Yes
Has an emergency spillway been provided?  Yes
Has pretreatment been provided per Section
  Yes
6.1.3?
Enter freeboard depth (ft)  1
Enter side slopes above permanent pool (X:1)  4
Enter aquatic bench slope (%)  15
Enter aquatic bench slope to pond floor (X:1)  6.66
Enter min. aquatic bench width provided (ft)  10
Enter aquatic bench average width provided (ft)  15
Enter aquatic bench depth (inches)  1.5
Enter maintenance access slope (%)  5
Enter maintenance access width (ft)  20
Enter permanent pool depth (ft)  4
Minimum permanent pool depth per Water
  4.00
Balance Calculation (ft)
  Sizing Criteria
  Value  Units  Notes
  Required Water Quality Volume  46210  cf
  Pretreatment WQv Provided  5000  cf
  Permanent Pool WQv Provided  50000  cf
  Extended Detention WQv Provided  0  cf
  Determine the Water Quality Volume Treated
Water Quality Volume Treated  46,210  cf

  Page 819 of 1174