will be stored in a secure location, with their lids on, preferably under cover, when not
  in use.

  2.  The minimum practical quantity of all such materials will be kept on the job site.

  3.  A spill control and containment kit (containing, for example, absorbent materials, acid
  neutralizing powder, brooms, dust pans, mops, rags, gloves, goggles, plastic and metal
  trash containers, etc.) will be provided at the storage site.

  4.  Manufacturer's recommended methods for spill cleanup will be clearly posted and site
  personnel will be trained regarding these procedures and the location of the information
  and cleanup supplies.

  B.  In the event of a spill, the following procedures should be followed

  1.  All spills will be cleaned up immediately after discovery.

  2.  The spill area will be kept well ventilated and personnel will wear appropriate
  protective clothing to prevent injury from contact with the hazardous substances.

  3.  The project manager and the Engineer of Record will be notified immediately.

  Spills of toxic or hazardous materials will be reported to the appropriate federal, state,
  and/or local government agency, regardless of the size of the spill. Spills of amounts
  that exceed Reportable Quantities of certain substances specifically mentioned in
  federal regulations (40 CFR 110, 40 CFR 117, and 40 CFR 302) must be immediately
  reported to the EPA National Response Center, telephone 1-100-424-1102. From SWPPP-
  9 “Reportable Quantity Release Form” must be filled out.

  4.  If the spill exceeds a Reportable Quantity, the SWPPP must be modified within seven (7)
  calendar days of knowledge of the discharge to provide a description of the release, the
  circumstances leading to the release, and the date of the release. The plans must
  identify measures to prevent the recurrence of such releases and to respond to such
  releases.

  C.  The job site superintendent will be the spill prevention and response coordinator. He will
  designate the individuals who will receive spill prevention and response training. These
  individuals will each become responsible for a particular phase of prevention and response. The
  names of these personnel will be posted in the material storage area and in the office trailer
  onsite.

119  CONTROL OF NON-STORM WATER DISCHARGES

  Certain types of discharges are allowable under the NYSDEC SPDES General Permit for Construction
  Activity for the State of New York, and it is the intent of this SWPPP to allow such discharges. These
  types of discharges will be allowed under the conditions that no pollutants will be allowed to come in
  contact with the water prior to or after its discharge. The control measures which have been outlined
  previously in this SWPPP will be strictly followed to ensure that no contamination of these non-storm
  water discharges takes place. The following allowable non-storm water discharges which may occur at
  the job site include:

  A.  Discharges from firefighting activities.

  B.  Fire hydrant flushings (see note below)