Southtowns Record

PBM 8.13.26 FINAL

Government
Town of West Seneca
Board
Planning Board
Meeting
Aug 13, 2026, 6:00 p.m.
Posted by publisher
Oct 1, 2026
Kind
Minutes
Topics
Zoning and land use, Water, sewer and drainage, Roads and traffic, Public safety, Budget and taxes

Original document

Same meeting

Text · page 3 of 6

department and during building permit review, characterizing them as building
  code issues rather than site plan items. Indicated fire department comments should
  address these concerns.
  o Additional Board Exchange: Joseph Sherman expressed dissatisfaction with
  repeated “we’ll get back” responses. Discussion acknowledged the boundary
  between building vs. site plan review.
  •  Public Comments:
  o George Heidi (former volunteer firefighter):
  ▪ Questioned rooftop heat pump access and timely snow clearing due to
  heavy drifting.
  ▪ Asked about elevators for handicapped residents and ensuring
  accessibility, feeling these should have been addressed earlier.
  •  Motion: A motion was made to approve the site plan as outlined in submitted drawings.
  An amendment was added by the Chair.
  o Recommendation: Approve site plan subject to the completion of the items
  enumerated in the letter from the Engineering Department.
  o Motion by: Margaret Bebak
  o Seconded by: James Frick
  o Ayes: Majority (voice vote "Aye")
  o Noes: Joseph Sherman & William Wise
  o Abstain: None stated
  o Motion carried

New Businesses

SPR 2026-007 Request of Benchmark Streamline LLC for site plan approval for property
located at 325 Orchard Park Road for a multi-building mixed-use development (Costco
anchor) and associated site work.

  •  Business Speakers:
  o Ralph Lorigo (attorney, on behalf of Benchmark Streamline LLC)
  o Martin Dellebovi (Benchmark Group)
  o Chris Wood (Carmina Wood Design) – civil engineering lead
  o Mark Marchisano (Costco Director of Development)
  o Kimberly Masiuk (Project Manager, BL Companies (on behalf of Costco)
  o Kevin Kilguss, (Project Manager, BL Companies (on behalf of Costco)
  o Applicant Statements:
  o Project Overview: Seeking approval for a 56-acre development, including the
  Costco site and main infrastructure (interior roads, stormwater, utilities). The
  Costco building will be ~158,000 sq ft (~187,000 sq ft total with MDO) with gas
  pumps on an 18-acre parcel. The project is framed as a major tax base expansion.
  o Tenant Strategy: A mix of services, restaurants, and retail is planned to ensure a
  complementary tenant mix and high occupancy. Retailer interest reportedly
  exceeds available space.