Text · page 1 of 3
Read the whole document on one page (all 3 pages, each with its own heading)
P.B. Mtg. #10 P.B. Regular Mtg. #08 September 10, 2026 Page 1 PLANNING BOARD SEPTEMBER 10, 2026 MEETING MINUTES MEMBERS PRESENT: Harold Fabinsky, Chairman Nicholas Baich John Deluca David Kaczor Richard Schechter EXCUSED: Bernadette Clabeaux Henry Heppner David Mellerski, Alternate OTHERS PRESENT: Gregory Bennett, Town Board Liaison Maura Seibold, Deputy Town Attorney Thomas Minor, Supervising Code Enforcement Officer Tom Ostrander, Assistant Municipal Engineer Anna Worang-Zizzi, Director of Community Development Kristin B. Mahoney, Recording Secretary The Chairman announced exit procedures in the event of a fire alarm and called the Planning Board meeting to order at 7:00 P.M. in the Orchard Park Community Activity Center. He stated that if anyone appearing before the Board has a family, financial or business relationship with any member of the Board, it is incumbent upon that person to make it known under State Law and the Town Code of Ethics. REGULAR BUSINESS: 1. P.B. File #02-26C, 3129 Orchard Park Road, located in the old Valu plaza, Project Phase 3, Zoned B-2. Bevilacqua Development is seeking Planning Board approval of a site plan for two (2) separate outparcels and associated site improvements. (SBL #152.12-4-8 & 9). Petitioner Appearance: Mike Bevilacqua, Applicant Chris Wood, Carmina Wood Design, Project Engineer Mr. Wood summarized the approvals the project has received from outside agencies and stated that no approvals from outside agencies were outstanding. Mr. Baich stated that he liked the project, and the Engineering Department has stated that the cooperation from Bevilacqua is incredible. Mr. Kaczor stated that he felt that the in and out involving the public roadway is not a problem if proper signage is present. There is concern with the stacking of cars. There are many businesses in the structures and tenants will be vocal with any problems. There will be a usage rush when the project is new but it will level off as time goes on. He feels this is an outstanding project and that Bevilacqua is good to work with. Mr. Bevilacqua stated that in his lease contract with 7 Brew Coffee, it is stated that any additional traffic controls required will be controlled by Bevilacqua at 7 Brew’s expense. Mr. Wood stated that flag people for 7 Brew will manually direct people in the event the stacking lanes become too busy. He also pointed out that peak time at 7 Brew is in the morning and peak times at the other tenants were afternoon and evening. Mr. Deluca feels that the key to it working is making sure no one tries to exit using the one-way entrance. He pointed out that vehicle stacking is not involving the public roadway. He feels that other tenants will be vocal if there are queuing problems. He thinks this is a very good project. Mr. Wood stated that there will be signage at the drive-through exit and striping on the driveway. The Chair stated that he is pleased to see a project come in to fill what could become a derelict vacant space. This is in line with the long-range Comprehensive Plan. Queuing is a difficult question and will involve the time of day and the cycle of business. He inquired if the Applicant had a traffic analysis. Mr. Wood stated that the maximum number in the stack that the average 7 Brew has is seven in the stack and normal is four in the stack. He stated that this is based on actual field observation.