Text · page 3 of 3
Read the whole document on one page (all 3 pages, each with its own heading)
P.B. Mtg. #10 P.B. Regular Mtg. #08 September 10, 2026 Page 3 mixed use and commercial buildings. This project will require rezoning a portion to R-1 with a Conservation Management Overlay and rezoning another portion to the future “Gateway Mixed Use” zoning designation. THE VOTE ON THE MOTION BEING: FABINSKY AYE BAICH AYE DELUCA AYE KACZOR AYE SCHECHTER AYE THE VOTE ON THE MOTION BEING UNANIMOUS, THE MOTION IS PASSED. 4. P.B. File # 18-20, “Williamsburg Subdivision”, a proposed 16-Lot Subdivision upon 13.71+/- acres of Vacant Land, located on the west end of the existing Diller Road dead end, Zoned R-2. (SBL # 161.08-2- 14). Planning Board to accept Lead Agency Status. Petitioner Appearance: Chris Wood, Carmina Wood Design, Project Engineer Mr. Baich made a MOTION, seconded by Mr. Deluca, that the Planning Board Accept Lead Agency Status for this UNLISTED SEQR action, with a coordinated review, for this 16-lot subdivision. THE VOTE ON THE MOTION BEING: FABINSKY AYE BAICH AYE DELUCA AYE KACZOR AYE SCHECHTER AYE THE VOTE ON THE MOTION BEING UNANIMOUS, THE MOTION IS PASSED. 5. P.B. File #24-26, 9274 Group Inc, 0 South Benzing Road, located on the Western side of the Northern end of South Benzing Road, Zoned DR-2. Applicant proposes to construct a flex use industrial building. ZBA Approval granted 7/21/26. Planning Board to seek Lead Agency Status (SBL#161.06-1-2). Petitioner Appearance: Tom Fox, Ellicott Development Chris Wood, Carmina Wood Design, Project Engineer Mr. Kaczor stated that he does not want this project to become a warehousing project. The Board will ask that the Applicant come before it in relation to the second and third proposed buildings. The Chair added that he is concerned about warehousing and/or entities where the product is not made or sold in Orchard Park. Mr. Fox stated that warehousing was not the intent of the project. Mr. Kaczor made a MOTION, seconded by Mr. Deluca, that the Planning Board seek Lead Agency Status for this UNLISTED SEQR action, with a coordinated review, for this project. THE VOTE ON THE MOTION BEING: FABINSKY AYE BAICH AYE DELUCA AYE KACZOR AYE SCHECHTER AYE THE VOTE ON THE MOTION BEING UNANIMOUS, THE MOTION IS PASSED. There being no further business, the Chairman adjourned the meeting at 7:34 pm. DATED: 09/24/26 Respectfully submitted, REVIEWED: 10/13/26 Kristin B. Mahoney, Recording Secretary APPROVED: 11/12/26 Harold Fabinsky, Planning Board Chairman