Southtowns Record

Supporting Documentation

Government
Town of Orchard Park
Board
Town Board
Meeting
Nov 4, 2026
Kind
Agenda packet
Topics
Parks and recreation, Budget and taxes, Water, sewer and drainage, Roads and traffic, Zoning and land use, Public safety

Original document

Same meeting

Text · page 4 of 37

Read the whole document on one page (all 37 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Proposed Local Law 06-2026 Public Hearing scheduled for November
4, 2026
 121 ARTICLE XII Trail Development

 Applicability

 121.72 Applicability
 This ordinance applies to all residential, mixed-use, and land developments that:

  e  Create any new public or private street; or

  e  Create more than 3 new dwelling units; or

  «  Subdivide land adjacent to a public park or recreation land.

 121.73 Exemptions
 The Planning Board may grant a limited exemption where:

  e  The parcel is too small or constrained by topography or environmental features to reasonably
  accommodate a trail or public access; or

  e  Arequired trail segment would be unsafe or infeasible due to engineering, legal, or environmental
  constraints, and an alternative alignment or fee-in-lieu is approved.

 Definitions

 121.74 Definitions
 For the purposes of this ordinance:

  e  “Trail” means a multi-use path intended primarily for non-motorized travel (such as walking and
  bicycling), with a minimum improved surface width as specified herein.

  e  “Side path” means a shared-use path parallel and adjacent to a roadway, separated by a buffer.

  e  “Greenway” means a linear open space including natural features and corridors that may incorporate
  trail facilities.
  e  “Designated trail corridor” means any existing or proposed trail alignment identified on the Town of
  Orchard Park’s officially adopted plans or maps.
  e  “Developer” means any person or entity proposing subdivision or land development subject to
  municipal approval.

  e  “Planning Board” means Town of Orchard Park Planning Board

 General Trail Requirement

 121.75 Required Trails
 Where a subdivision includes, is adjacent to, or provides logical connection to a designated trail corridor, the
 developer shall dedicate right-of-way and construct trail facilities consistent with this ordinance and the Town
 of Orchard Park’s trail/bikeway plan.
 121.76 Connectivity
 Trails required under this ordinance shall:
  e  Connect to trails, sidewalks, parks, schools, and other community destinations located on or reasonably
  near the site.