Text · page 5 of 37
Read the whole document on one page (all 37 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
e Provide continuous, direct routes through or around the subdivision, minimizing dead-ends. e Be aligned to allow future connections to adjoining parcels. 121.77 Public Access Required trails shall be publicly accessible, either through dedication of land to the Town of Orchard Park or through public access easements or public right-of-way recorded on the final plat. Planning and Layout Standards 121.78 Consistency with Plans Trail alignments shall be consistent with the Town’s adopted plans including; comprehensive plan, parks and recreation plan, and trail/bikeway plan, and designated trail corridors, cross-sections and Town of Orchard Park Design Standards. 121.79 Alignment and Design Principles Trail layout shall: e Follow natural contours where feasible to minimize grading and erosion. e Avoid sensitive environmental areas to the greatest extent practicable, including wetlands, steep slopes, and critical habitats. e Provide reasonable sight distances and safe intersections with streets and driveways. e Utilize side-hill construction and proper drainage where slopes exceed recommended thresholds. e Adhere to Town of Orchard Park Trail Standards and Design Requirements. 121.80 Integration with Open Space Trails should be located within required open space, greenways, or parkland where possible, and be coordinated with stormwater, utility, and conservation areas to maximize multi-functional use of land. Design and Construction Standards 121.81 Design Professional Trail plans shall be prepared or overseen by a qualified design professional (e.g., landscape architect or engineer licensed in the State of New York). 121.82 Width and Cross-Section Unless otherwise specified by the Town’s adopted standards: e Shared use trails serving the public shall have a minimum paved or improved surface width of 8 feet. 121.83 Surface and Materials Trail surface and materials shall be suitable for intended use and context, considering accessibility and maintenance, and may include asphalt, compacted stone , or other approved surfaces by-the Town of Orchard Park Engineering Department. 121.84 Grades and Drainage e Proper drainage and erosion controls shall be designed and installed, including but not limited to ditches, culverts, and stabilization measures where needed. 121.85 Intersections and Crossings Where trails intersect streets, driveways, or other trails: e Sight distances shall be evaluated and maintained.