Text · page 6 of 37
Read the whole document on one page (all 37 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
e Appropriate crosswalks, signage, markings, and, where warranted, traffic calming or crossing treatments shall be provided. 121.86 Structures Trail related bridges, boardwalks, railings, retaining walls, and similar structures shall be designed to applicable engineering and safety standards and be suitable for expected loads and environmental conditions and Town adopted Standards. Easements, Dedication, and Ownership 121.87 Trail Easements Public trail easements shall: e Be shown and labeled on preliminary and final subdivision plat plans and drawing sets. e Include sufficient width to accommodate the trail, shoulders, maintenance access, and vegetation management. e Grant the Town of Orchard Park the right to construct, maintain, repair, and regulate public use of the trail. 121.88 Dedication of Land Where the Planning Board determines that dedication is appropriate, trail corridors and associated land may be dedicated as public right-of-way or parkland as a condition of subdivision approval. 121.89 Ownership and Maintenance The Planning Board shall determine whether trails will be owned and maintained by the Town, a homeowners’ association, or another approved entity, and such responsibilities shall be documented in recorded agreements. Construction, Inspection, and Acceptance 121.90 Construction Timing Trail construction shall be completed prior to issuance of final occupancy permits for the phase of the subdivision in which the trail is located, unless the governing body approves an alternative phasing plan and associated financial security. 121.91 Inspections The municipality Town of Orchard Park Engineering Department or its designee shall have the right to inspect trail construction at reasonable stages, including subgrade, base, surface, and final completion. 121.92 Acceptance Upon satisfactory completion and inspection, the municipality shall accept dedicated trails or easements for public use or approve final acceptance by a homeowners’ association or other owner, as applicable. Fee-in-Lieu and Alternatives 121.93 Fee-in-Lieu Where physical construction of a trail segment is infeasible or not immediately warranted, the Town Board may, at its discretion, accept a fee-in-lieu of construction, to be deposited into a dedicated fund for trail acquisition, design, and construction. ‘ 121.94 Off-Site Improvements In lieu of on-site trail construction, the Planning Board may allow or require the developer to construct or improve off-site trail segments that better achieve network connectivity and public benefit, subject to agreement. Modifications 121.95 Modifications